Preparations for start-up
6-10
61211-1310402
CONTURA
2
Move the holder cover in the direction of the arrow
[3]
and loosen
both Allen screws
[2]
slightly;
do not
remove them completely from
the machine key.
3
Move the holder to the profile rail.
The slot nut must be properly inserted in the profile rail.
4
Proceed in the same way when sliding the other holders onto the
profile rail.
The permissible number for the holders depends on the probing sys-
tem and position of the profile rail.
5
Reattach the cap to the profile rail.
6
Distribute several holders evenly on the profile rail and align them
horizontally.
7
Tighten the screws
[2]
.
Qualifying the holders
The holders must be qualified in the following cases:
When to qualify?
Which holders are to be qualified?
When a new changer rack is installed
Qualify all holders.
If a holder is added
Qualify the new holder.
When the position of a holder changes
A holder is moved on the profile rail.
Qualify the new holder.
The height of a profile rail was changed.
Qualify all holders on the profile rail.
Position of the changer rack was changed.
Qualify all holders on the changer rack.
For more information on qualification, please refer to the operating in-
structions for the measuring software.
Visual check and check list
The visual check must be part of the routine work to be carried out dur-
ing the daily measuring operation. Before switching the CMM on, make
sure by means of a visual check that the measuring system components
do not show any visible damage.
In case of damage, …
Start-up of the CMM is not allowed in case of damage to the CMM.
1
In this case, protect the CMM against switching on.
Disconnect the CMM from the power supply.
Содержание CONTURA
Страница 46: ...Components and function 3 10 61211 1310402 CONTURA Attaching the holders to the profile rail 6 9...
Страница 55: ...4 61211 1310402 CONTURA 4 1 Technical data This chapter contains CMM 4 2 Technical data...
Страница 62: ...CMM 4 8 61211 1310402 CONTURA...
Страница 68: ...Installation 5 6 61211 1310402 CONTURA...
Страница 90: ...Setting up the workpiece 6 22 61211 1310402 CONTURA 200 100 100 200 100 600 Size 9 12 Z...
Страница 91: ...Setting up the workpiece 61211 1310402 CONTURA 6 23 600 100 600 100 600 100 Size 9 18 Z...
Страница 92: ...Setting up the workpiece 6 24 61211 1310402 CONTURA 600 100 600 100 800 100 Size 12 18 Z...
Страница 122: ...Terminating the measuring operation 7 26 61211 1310402 CONTURA...
Страница 130: ...Service features 8 8 61211 1310402 CONTURA...
Страница 131: ...9 61211 1310402 CONTURA 9 1 Maintenance and care This chapter contains Maintenance 9 2 Care 9 4 Maintenance and care...
Страница 150: ...2Glossary 2 61211 1310402 CONTURA...
Страница 156: ...6Alphabetic index 6 61211 1310402 CONTURA...
Страница 157: ......
Страница 158: ...CONTURA Operating instructions 2022 04 29 61211 1310402...