US=çÑ=NSQ
fåëíêìÅíáçå=j~åì~ä=^ìêáÖ~=`çãé~Åí=ÉåMP
SK=léÉê~íáçå
`êçëë_É~ã
®
çéÉê~íáçå
6.6. CrossBeam
®
operation
It is assumed that the operator is already familiar with general functions of SmartSEM
®
and the
operation of the FESEM.
IMPORTANT
For general information about SmartSEM
®
refer to the Software Manual SmartSEM
®
.
6.6.1. Preparing the workstation
Before you can make use of the CrossBeam
®
functions, you have to prepare the workstation.
At a glance
The complete sequence includes:
•
Getting started
•
Adjusting tilt eucentricity
•
Switching on the ion beam (FIB)
•
Setting the coincidence point
6.6.1.1. Getting started
1
Switch on the workstation.
2
Start the SmartSEM
®
user interface and log in.
3
Initialise the specimen stage.
4
Load the specimen chamber with an appropriate specimen.
5
Evacuate the specimen chamber.
6
Switch on the SEM:
a
Switch on the gun.
b
Switch on the EHT.
7
Ensure the
Specimen Current Monitor
is
switched off:
a
Select
Tools/Goto Panel
from the menu.
b
Double-click
Specimen Current
Monitor
.
c
Deactivate the
SCM On
checkbox.
This ensures that the touch alarm function is
active.
8
Bring the image into focus.
How to
continue
Continue with adjusting the tilt eucentricity.
Содержание AURIGA Compact Crossbeam
Страница 1: ...AURIGA Compact Crossbeam workstation Instruction Manual ...
Страница 50: ...RM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP PK aÉëÅêáéíáçå ìëíçãÉê ëÉêîáÅÉ ...
Страница 54: ...RQ çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP RK fåëí ää íáçå ...
Страница 150: ...NRM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Страница 156: ...NRS çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NNK ÄÄêÉîá íáçåë ...
Страница 160: ...NSM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...