background image

 

2.6 Safety notes concerning maintenance, inspection, and assembly works 

 
The operator has to make sure that all maintenance, inspection, and assembly works are carried out 
by  authorised,  skilled,  and  qualified  personnel  which  are  adequately  informed  by  having  thoroughly 
studied the operation manual.  
Generally,  works  on  the  machine  are  only  to  be  carried  out  when  the  machine  is  turned  off.  The 
procedure  of  switching  off  the  machine,  which  is  described  in  the  operation  manual,  has  to  be 
observed at all costs. 
Pumps or pump units which convey media that are hazardous to health have to be decontaminated. 
Immediately after completion of the works, all safety and protection devices have to be reattached or 
reactivated.  
 
Before restart, the points listed in the chapter commissioning have to be taken into consideration.  

 
 
2.7 Unauthorised modification of the machine and fabrication of spare parts 

 
Modifications  of  the  machine  are  permitted  only  after  having  consulted  the  manufacturer.  Original 
spare parts and accessories authorised by the manufacturer ensure the safety. The use of other parts 
can lead to the removal of liability for the resulting damages.  
 
 

2.8 Unauthorised modes of operation 

 
The operational reliability is only guaranteed, if the machine is used as intended according to chapter 

– General. The limit values stated in the data sheet must not be exceeded!  

 
 
3. Transport and temporary storage

 

 
3.1 Transport 

 
The  prefabricated  pump  stations  of  the  type  series  FPS-K  (A)  are  not  to  be  thrown  or  dropped. 
Furthermore, they should be transported in upright position. 
 
 

3.2 Temporary storage/conservation 

 
For temporary storage and conservation, it suffices if the plant is stored in a cool, dark, dry, and frost-
protected place.  The plant should be stored in upright position.  

 
 
4. Description

 

 
4.1 General 
 

The  pump  station  is  completely  assembled,  so that  only  the  pump  has to  be  put  into  place  and  the 
connections (inlet, pressure pipe, ventilation line, level control  system and power supply) have to be 
established.  

Содержание FPS-KE

Страница 1: ...Pumping station Operation Manual FPS KE D ...

Страница 2: ... inspection and assembly works 7 2 7 Unauthorised modification of the machine and fabrication of spare parts 7 2 8 Unauthorised modes of operation 7 3 Transport and temporary storage 7 3 1 Transport 7 3 2 Temporary storage conservation 7 4 Description 7 4 1 General 7 4 2 Assembly and mode of operation 8 5 Installation 8 5 1 Excavation of the trench 8 5 2 Insertion of the shaft 8 5 3 Connection of ...

Страница 3: ...t regulations EC low voltage directive as amended 93 68 EWG Appendix I EMC directive 92 31 EWG and 93 68 EWG Applied harmonized standards particularly EN 292 part 1 EN 292 part 2 Draft EN 292 part 2 A1 EN 60 335 1 EN 60 335 2 41 EN 55014 4 93 EN 55104 95 Applied national technical standards and specifications particularly DIN EN 292 part 1 DIN EN 292 part 2 draft DIN EN 292 part 2 A1 DIN VDE 0700 ...

Страница 4: ...meter approx 1100 mm Shaft heights Base body height Height with attachment piece and BEGU manhole cover class A Height with attachment piece and BEGU manhole cover class B Height with attachment piece and BEGU manhole cover class D H2 1600 1730 1960 1775 2005 1810 2040 H3 2100 2230 2460 2275 2505 2310 2540 H5 3100 3230 3460 3275 3505 3310 3540 Opening of the manhole cover 625 mm Weight 60 kg 90 kg...

Страница 5: ...sheet 24 292 The operation manual at hand provides basic notes which have to be taken into account during assembly operation and maintenance works Therefore before assembly and commissioning this operation manual has to be read by the assembler as well as by the responsible personnel operator at all costs It always has to be available on site of operation of the machine plant The general safety no...

Страница 6: ...otes are not observed this can result in the loss of all compensation claims In detail non observance can for instance result in the following damages Failure of important functions of the machine plant Failure of the prescribed methods for maintenance and repair Endangerment of persons through electrical mechanical and chemical influences Endangerment of the environment through leakage of hazardo...

Страница 7: ...ions of the machine are permitted only after having consulted the manufacturer Original spare parts and accessories authorised by the manufacturer ensure the safety The use of other parts can lead to the removal of liability for the resulting damages 2 8 Unauthorised modes of operation The operational reliability is only guaranteed if the machine is used as intended according to chapter 1 General ...

Страница 8: ...and repair work a gate valve is mounted in front of the check valve inside the pressure pipe 5 Installation 5 1 Excavation of the trench Concerning the excavation of the trench please observe the regulations of the Employer s Liability Insurance Association angle of repose possible sheeting etc 5 2 Insertion of the shaft Before inserting the shaft the trench has to be filled up with 30 cm of grave...

Страница 9: ... of the pressure pipe according to ATV A116 or DIN 4279 Part 1 9 must not be carried out against the closed gate valve in the pump shaft If all pipes are connected and checked for tightness the trench can be filled According to the regulations backing sand or gravel sand has to be used to fill the trench Only use gravel sand of a grit size of up to 32 mm as far as the excavated ground does not cor...

Страница 10: ... of our after sales service points on the internet www zehnder pumpen de 8 Malfunctions causes and elimination Disconnect the power supply before carrying out any kind of work on the plant In case of malfunctions of the pump s please read the respective operation manual In case of leakages of the pipelines or in case of malfunctions of the valves the respective parts can be replaced substitution 9...

Страница 11: ...11 Appendix A main dimensions ...

Страница 12: ...d directives for excavacations with regard to road construction and DIN 18196 1 Customary BEGU manhole cover class D 2 Customary concrete rings for height compensation 3 Attachment piece made of plastic adjustable in height from 40 max 300 mm Safety notes Installation assembly operation and maintenance are to be carried out by a professional company only Please observe the respective directives an...

Страница 13: ...chtung Lip seal Zulauf Inlet Höhenverstellbar Ajustable in height Druckabgang Discharge coupling Schachthöhe Height of shaft handelsüblich customary Übersetzung Grafik Appendix B Ca Approx Verschleißschicht wearing surface bituminös bituminous Sauberkeitsschicht Granular sub grade course Schotter Gravel Frostschutzkies Frost blanket gravel Erdreich Ground Splitt Chippings ...

Отзывы: