background image

 

Distance from the 
core hole to the 
window reveal 
 

 

Preparing for installation 

A vertical outer wall and a flat surface on the outside of the shell wall are required to properly install the 
embrasure module. Any uneven surfaces must be compensated for in the area where the embrasure 
module is fitted to the shell wall surface.

 

  Drilling the core hole 

Before drilling the core hole, select one of the four possible embrasure module installation variants. The minimum wall 
thickness must be 335 mm. If the shell wall is not thick enough, the difference must be compensated for by placing 
insulation under the embrasure module in the thermal insulation composite system plane. 

1.  Determine the core hole position based on the relevant installation variant in section 

3

 

Installation

 

versions

Ensure that there is sufficient clearance around the installed ComfoSpot 50 unit and that there is enough room for 
maintenance work to be carried out (at least 39 cm on the left, 29 cm on the right, 70 cm at the front and 20 cm at 
the top – in relation to the pipe axis of the wall mounting pipe; viewed from the inside of the outer wall). 

2.  Drill the core hole (

 340 mm) in the horizontal axis of the drill hole, observing the explanations given in section 

4

 

Installation

 

position

      

 

  Preparatory work for direction-change adapter installation 

Depending on the intended installation variant, the moulded parts serving as duct closure openings must be separated 
from the EPP housing and the fixing clips (1) must be attached. 
The processing measures are shown in the following sections based on installation variant 1: ODA and EHA duct on the 
left. 

When installed, the

 

 OBEN / TOP 

 

embossing on the EPP housing must be positioned at the top. 

1.  Use a sharp knife or a fine-tooth saw to carefully cut off the EPP moulded parts in the profile groove (white dashes) 

of the relevant duct connections. The separated EPP moulded parts are to be inserted as blanking plugs in the duct 
adapters (8) to protect against contamination until the facade is finished and the discharge grilles (10) are installed. 

Содержание ComfoSpot 50

Страница 1: ...Design Heizk rper Komfortable Rauml ftung Heiz und K hldecken Systeme Clean Air Solutions Embrasure module installation instructions Zehnder ComfoSpot 50...

Страница 2: ...installing the thermal insulation composite system 8 Installing the direction change adapter 8 Adapting shortening the flat ducts 8 Installing the flat ducts duct adapters duct insulating elements 9 I...

Страница 3: ...e observed Compliance with the relevant fire protection requirements must be ensured in advance The embrasure module can only be installed with a minimum insulating layer thickness of 120 mm and is to...

Страница 4: ...flow is conducted via the lower duct connections discharge grille The OBEN TOP embossing on the EPP housing indicates the prescribed installation position The illustrations show the system as viewed f...

Страница 5: ...ns provided that the required installation area for ComfoSpot 50 on the inside of the outer wall is taken into account see section 5 1 Drilling the core hole The unit core hole pipe axis must be posit...

Страница 6: ...rried out at least 39 cm on the left 29 cm on the right 70 cm at the front and 20 cm at the top in relation to the pipe axis of the wall mounting pipe viewed from the inside of the outer wall 2 Drill...

Страница 7: ...laced with a distance of approx 10 cm to the side and approx 2 cm at the top between the drill hole and the outer edges of the direction change adapter 3 and screwed to the EPP housing using PVC screw...

Страница 8: ...remains level and round max permissible deviation from the circular shape 1 5 mm If the tube exceeds these tolerances then it is to be brought in the corresponding form fixed with suitable auxiliary m...

Страница 9: ...ade finish of the vertical window reveal 3 If you have selected installation variant 1 or 2 shorten the second flat duct 6 to the same dimension If you have selected installation variants 3 or 4 proce...

Страница 10: ...ng in order to make it easier to insert the round profile gasket on the side facing the wall 4 Then carry out the same installation steps for the upper flat duct 6 5 Shorten the length of the four fla...

Страница 11: ...mal insulation composite system in such a way that there are no gaps between the insulation material and the embrasure module 2 After covering the embrasure module with insulation material up to the s...

Страница 12: ...parts of the duct adapter as follows see section 6 1 2 Adapting shortening the flat ducts 1 After applying the final facade surface carefully cut off the protruding material from the EPP body using a...

Страница 13: ...illes 10 2 Place the discharge grilles 10 on the duct adapters 8 and fasten them in place with the M5x16 countersunk screws supplied The waterproof swelling sealing tape which is pre fitted to the bac...

Страница 14: ...ons_embrasure module CS50_V0519 EN subject to change Sales International Zehnder Group Deutschland GmbH Almweg 34 77933 Lahr Germany T 49 7821 586 392 sales international zehndergroup com www internat...

Отзывы: