
zebris Medical GmbH
FDM-T Technical Data and Operating Instructions
Page 44/65
5.4
Gait Training Type F (ForceLink C-Mil 1.6 & C- Mil 1.8)
Accessories for gait training by visual stimulation with treadmill type Forcelink.
Assembly of the projector adapter
WARNING
Please regularly check (recommended after 25 operating hours
each) that all screws of the handrail and projector mount are tightly
fastened.
Required Tools: Allan Key 4mm, 5mm
In the first step open the fixation screws on both sides of the
front hand rail. Then carefully lift it out of its sockets in upward
direction.
Now place the projector adapter on the sockets of the front
handrail. Then again set the handrail into the socket and
thoroughly fix it by locking the screws.
Place the projectors stand on the adapter as illustrated left
hand side and attach it with the screws removed previously.
After attaching the covers the stands assembly is finalized.
For the final assembly of the projector to its stand please refer
to the user manual of the projector manufacturer.