User’s Manual 1PH HYD3000-HYD6000-ZP1
Rev. 1.0 01/09/2023
Identification: MD-AL-GI-00
Rev. 1.1 of 27/01/2023 - Application: GID
123/193
10.11.
Verification of proper functioning
To check the proper functioning of the inverter, follow these steps:
a)
Switch off any source of photovoltaic generation by turning the circuit breaker to the OFF position.
b)
Lower the protection switch of the 1PH HYD3000-HYD6000-ZP1 inverter. The inverter will remain
switched on but will go into error due to a lack of AC power (if the EPS function is enabled, it will
feed the priority loads).
1.
Power up the inverter by pulling up the AC switch.