Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
-
Appl
ic
at
ion
: G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. - 94189
Certified Company ISO 9001 - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/08/2020 Rev. 1.2 “User Manual 7000-BE-24”
26/43
Figure 17 – Wall fixing
5.2.
Mounting on metal support
1)
After positioning the metal support and routing the connection cables, place the station on top of
the support.
2)
Fix the station from below using the screws contained in the mounting kit.
Figure 18 - Positioning of support post