Refrigeration unit
Series Zero Direct-Drive
Z200 | Z250 | Z350 | Z380
Z380 Multi
INSTALLATION MANUAL
rev.01
37
3 INSTALLATION
3.1 Tools required
Before proceeding with the installation of the unit on the truck, it is necessary to check that you have the
following tools available:
•
Protective goggles and PPE
•
Drill
•
Drill bits
•
Tape Metro
•
Mechanical tools
•
Ladder
•
Work platform
•
Lifting device
•
Vacuum pump
•
Dry nitrogen
•
Torque wrench
•
Torch
•
Leak detector
DANGER
Always wear the appropriate PPE.