4.8. Checking before starting work
After completing installation of the unit a series of checks must be carried
out, listed as follows:
-
check that the various disassembled parts have been assembled.
-
Check the power cable.
-
Check that the control panel is working.
-
Check that the apertures for ventilating the room are adequate.
-
If present, check that the ventilation hood is working
.