INSTALLATION
17
Synthesis
06/40V GAS
4.9 CHECKING BEFORE STARTING WORK
After completing installation of the unit a series of checks must be carried out, listed as
follows:
check that the various disassembled parts have been assembled;
check the power cable;
check that the control panel is working;
check the integrity of the jointing for gas supply and exhaust tubes;
check that the apertures for ventilating the room are adequate;
check the nominal capacity of the oven while it is functioning at the exit point of the solenoid
valve;
If present, check that the ventilation hood is working.
Содержание SYNTHESIS 06/40V GAS
Страница 35: ...MAINTENANCE 35 Synthesis 06 40V GAS Fig 10 1 Wiring diagram for synthesis 06 40V gas 230 Vac 1 N 50 60Hz...
Страница 38: ...MAINTENANCE 38 Synthesis 06 40V GAS FIG 10 2 Exploded view Synthesis 06 40V gas components of carpentry...
Страница 39: ...MAINTENANCE 39 Synthesis 06 40V GAS FIG 10 3 Exploded view Conveyor Synthesis 06 40V gas...
Страница 44: ...DECLARATION OF CONFORMITY 44 Synthesis 06 40V GAS 10 DECLARATION OF CONFORMITY...