ZALMAN GS1200 Скачать руководство пользователя страница 1

English

Содержание GS1200

Страница 1: ...English...

Страница 2: ......

Страница 3: ...y from heat sources direct sunlight water oil and humid environments and place the unit on a flat stable vibration free and well ventilated area 7 Do not clean the product surface with chemicals or we...

Страница 4: ...TX ATX12V PCI AGP Card Compatibility Full Size 350 mm 13 7 Drive Bays 5 25 External Bay x 4 3 5 External Bay x 1 Internal Bay x 6 5 25 3 5 2 5 1 3in 1 Hot swap 3 5 Support Hot swap x 4 HDD Docking x 1...

Страница 5: ...GS1200 3 Top Panel I O Ports and HDD Docking Station USB 3 0 HDD LED Power LED Power Button Mic Headphones Reset Button USB 2 0 e SATA USB RESET MIC HEADPHONE POWER USB USB e SATA USB HDD Docking Sta...

Страница 6: ...ts HDD Tray 6 HDD Tray Cover 2 Front Cover 1 Stand front 1 Stand rear 1 PSU Support 1 PSU Bracket 1 Part Name Units Side Cover right 1 Side Cover left 1 Top Cover 1 Chassis 1 5 25 Bay Cover 3 Adapter...

Страница 7: ...S1200 User s Manual 1 Stand front 1 rear 1 Stand Off 11 A Bolt 6 32 12mm 12 HDD B Bolt 6 32 6mm 24 M B PSU C Bolt M3 12mm 4 Stand D Bolt M3 6mm 4 SSD Cable Tie 10 CPU 12V Extension Cable 1 Main Unit 5...

Страница 8: ...6 GS1200 Installation 1 Stand Assembly 2 Side Cover Removal 3 C Bolt...

Страница 9: ...downwards the PSU s cooling performance is enhanced Type B Case Air Circulation Type If the PSU s fan points inwards the PSU s cooling performance is enhanced When using the case in a dusty environme...

Страница 10: ...8 GS1200 4 Motherboard Installation ATX Board m ATX Board Please refer to the diagrams below for additional Stand Off positions based on motherboard type Stand Off B Bolt...

Страница 11: ...9 Eng GS1200 5 VGA Card Installation 6 Hot Swap HDD Installation 1 1 2 1 HDD Tray Removal...

Страница 12: ...ide and pushing in the direction as shown in the diagram Install the HDD and check that the Hot Swap Tray s Fixing Pins and the HDD s holes are properly aligned and fastened Fully insert the HDD insta...

Страница 13: ...11 Eng GS1200 7 5 25 3 5 Drive Installation 1 5 25 ODD Installation...

Страница 14: ...12 GS1200 2 Adapter Tray Installation Adapter Tray Removal Drive Installation to Adapter Tray A 3 5 FDD Installation B 3 5 HDD Installation B Bolt D Bolt 3 5 F D D 3 5 F D D 3 5 H D D 3 5 H D D...

Страница 15: ...13 Eng GS1200 3 Top HDD Docking Station 3 5 HDD Installation 2 5 HDD Installation C 2 5 SSD Installation D S S D S S D...

Страница 16: ...tion To use the Hot Swap feature the S ATA Cable s and the 4 Pin power cable must be connected to the Hot Swap PCB For HDD stability please power the system OFF before removing the HDD Frequent instal...

Страница 17: ...connect USB 2 0 3 0 3 SATA and audio cables please refer to the motherboard manual When the polarities are reversed the LED s will not function Power LED Power Motherboard side Power Button Side HDD L...

Страница 18: ...16 GS1200 1 Side Cover Fan 200 standard 120 optional 2 Bottom Panel Optional Fan 120 Optional Fan Installation and Replacement 4 200 Fan Pre installed standard 2 x 120 Fan Installation optional...

Страница 19: ...emoval Open the HDD Cover and remove the Fan Bracket before uninstalling the Bracket from the Fan Caution The replaceable fan s specifications are 92 W x 92 L 25 H It is recommended to install the fan...

Отзывы: