SECTION 2: SYSTEM INSTALLATION
YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, PA • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
NJEX ZEO Version 04/13/2021
Page 25
Skid System Mounting
1. Prepare a concrete slab that exceeds the NJEX ZEO skid length and width dimensions
by at least 12”.
2. When moving the system into place follow these lifting guidelines:
a. Lift containment skid systems using all four eyebolts on the skid. Ensure lifting
straps will not interfere with any valves installed on tank or any system tubing
before lifting. Adjust four-point lift if necessary.
b. Lift rail skid systems from the bottom of the skid by forklift or another device.
c. Do not lift a system by the tank lugs, these lugs are designed only for the weight
of the empty tank.
d. Do not move a system with liquid in the odorant tank.
WARNING: While lifting, all personnel should stand clear of the skid assembly. Keep all
hands, fingers, etc. free from under the cabinet while setting down. Lifting must be
performed with an adequate lifting system.
CAUTION: Do not move or lift a system with odorant in the tank. Tank must be empty
and any pressure vented prior to lifting.
CAUTION: Do not lift the skid by the eyebolts provided on the cabinet or the tank. System
can only be lifted by the eyebolts welded on the skid (if provided) or by lifting below with
a forklift.
3. Bolt the
system to the concrete slab using the ¾” mounting holes provided in the skid.
Recommended mounting bolt/stud sizes are either 11/16” or 5/8”.
4. Connect a ground wire from one of the grounding lugs located on the skid foot to a
properly installed ground rod located adjacent to the skid. *(Resistance to ground must
be less than 1 ohm)