YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 78
NJEX 7300G ver.08-2018
Section 12: System Maintenance
Filling the Verometer
Figure 199
Refer to the Filling the Verometer Operational Sche
1. Close
V2
,
V3
, and
V5
2. Open
V4
until the expansion tank gauge reads 25
psi (1.72 Bar). Close
V4
.
3. Open odorant supply valve
V17 and V6
on expan-
sion tank
4. Scroll down to the meter level screen on the
controller and select Fill and Fill Verometer YES
(meter level should stop at just above 0) on 6300
and 7300. Close
V9
completely then open 1.5
turns. On 8300 just move on to step 5
5. Select Fill and Fill Verometer YES on controller
(adjust V9 to fill in 3-4% increments) level should
stop at about 100%
6. Proceed to the Prime Start procedure on page 80
Содержание NJEX 7300G
Страница 1: ...NJEX 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M ...
Страница 2: ......
Страница 3: ...The NJEX 7300G Instruction Operating Manual Version 08 2018 ...
Страница 4: ......
Страница 10: ......
Страница 129: ...201 Ivyland Road Ivyland PA 18974 800 344 5399 P 281 362 6500 F 281 362 6513 Sales yzhq com www yzsystems com ...