![YZ Systems DynaPak DP-2010TP Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/yz-systems/dynapak-dp-2010tp/dynapak-dp-2010tp_system-support-manual_916164013.webp)
YZ Systems, Inc. 3101 Pollok Drive Conroe, Texas USA 77303 P: 936.788.5593 F: 936.788.5720
Page 7
DP-2010 TP ver.10012004
S
ECTION
2: S
YSTEM
I
NSTALLATION
Standard Mounting Location
1 The customer supplied sample probe should
be a minimum of five pipe diameters from any
device which could cause aerosols or significant
pressure drops.
2 The sample probe should not be located
within the defined meter tube region (AGA 3
manual).
A = The number of unobstructed, straight pipe
diameters upstream (see AGA - 3 manual).
B = The number of unobstructed, straight pipe
diameters downstream (see AGA - 3 manual).
0HWHU7XEH
2SWLPXP6DPSOHU3UREH/RFDWLRQV
'LIIHUHQWLDO3UHVVXUH'HYLFH
)ORZ
$
%
figure 3
Содержание DynaPak DP-2010TP
Страница 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010TP ...
Страница 2: ......
Страница 3: ...DP 2010TP INSTRUCTION OPERATING MANUAL Version 10012004 ...
Страница 4: ......
Страница 65: ......