5-37
Lubrication
Lubricate the lubrication points of the machine every 50 hours.
Lubrication steps:
1) Start the working device and put the bucket on the ground.
2) Put the bulldozing shovel on the ground.
3) Stop the engine.
4) Wipe clean the filling nozzles of each oil cup.
5) Lubricate each lubrication point and wipe off excess grease squeezed out.
1. Hinge point between stick
and bucket
2. Hinge point between
bucket arm and bucket
3. Hinge point between
connecting rod and bucket
4. The lubrication point of
the bucket cylinder head
5. Hinge point between
rocker and connecting rod
6. Lubrication point at the tail
of bucket cylinder
7. Lubrication point at the
head of the swing cylinder.
8. Lubrication point at the tail
of stick cylinder
9. Hinge point between stick
and platform
10. Lubrication point of the
swing cylinder
11. Lubrication points inside
the rotary support raceway
12. Lubrication point at the
rotary support gear ring
13. Hinge point between
bulldozer blade and frame
14. Hinge point a the
bulldozing cylinder head
15. Lubrication point at the
head of the swing cylinder.
16. Lubrication point of the
swing cylinder
17. Lubrication point at the
tail of the boom
18. Lubrication point at the
boom cylinder head.
19. Hinge point between
rocker and stick
Lubrication points (models
with boom not swinging)
Содержание U35
Страница 5: ...1 1 1 Preface...
Страница 15: ...2 1 2 Safety regulations...
Страница 45: ...3 1 3 Introduction of components...
Страница 70: ...4 1 4 Operation guide...
Страница 90: ...4 21 6 After the engine shuts down reset the shutdown lever...
Страница 104: ...5 1 5 Maintenance...
Страница 130: ...5 27 tank to reach the middle of the oil dipstick 11 Install the oil suction filter and cover the air filter...
Страница 147: ...6 1 6 Accessories guide...