background image

 

 

Volume Booster    YT-320   Installation manual 

 

Installation 
 

 Caution 

When installing the product, please follow below procedures.     

 

Always wear safety equipments and follow safety procedures.     

 

Compressed gas can be exploded and damage the body/parts or surrounding 
structure, if the product's maximum specification exceeded. Please check the 
product's specification before installing.    Also, in order to minimize the damage, in 
case of accident, please make sure all of the compressed/pressurized input lines 
by-passed.   

 

For maintenance, please stop volume booster's operation timely basis.     

 

Air must be clean, dry, and not corrosive gas which must be passed through the 
filter.   

 

Inflow air will be exhausted through the exhaust port which located on the side of 
the volume booster.   

 

Please be check exhaust port for substances or obstacle. Also, make sure not to 
leave volume booster in sealed places.     

 

It is recommended to use appropriate capacity of air filter regulator.     

 
 
 
 
 

Install Layout 
 

YT-320 should be installed between actuator, positioner, and supply pipes, and can be installed 
without a bracket which can be supported only by air pressure pipes.  Before connecting pipes, 
please make sure the inside of pipes are clear, and the size of the pipe are relevant to the capacity.     
If the booster must be mounted on a bracket, the bracket must be made according to the outer 
dimension on the previous page.     
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 
 

 
 
 
 

Young Tech Co.  #662-8 PumgMu Dong, Kimpo City, (415-809) Korea  (031) 986-4935   www.ytc.co.kr

 

Отзывы: