YouthPOWER SOLKATT YP-ESS10-8HVS1 Скачать руководство пользователя страница 1

User Manual

Energy Storage System

YP

-ESS10-8HVS1/2

version 1.0 : 2024/3/29

www.youth-power.net

Содержание SOLKATT YP-ESS10-8HVS1

Страница 1: ...User Manual Energy Storage System YP ESS10 8HVS1 2 version 1 0 2024 3 29 www youth power net...

Страница 2: ...nd mechanical schematics Have received professional training related to the installation and commissioning of electrical equipment Capable of promptly responding to hazards or emergencies that may ari...

Страница 3: ...s between document issues are cumulative meaning that each subsequent document issue includes all the changes made in earlier issues V1 0 2023 12 15 This version is the first official release version...

Страница 4: ...2 SOC Indicator Status Indicator Guides 11 2 6 PV Energy Storage System PV ESS 15 2 6 1 PV Energy Storage System PV ESS 15 2 6 2 Declaration For EPS Function 15 2 6 3 Energy Management 16 3 Function D...

Страница 5: ...6 3 1 PV Input Configuration 37 6 3 2 Assembling the PV Connectors 38 6 3 3 Installing the PV Connector 40 6 4 WLAN RS485 Connection 42 7 Commissioning 44 7 1 Inspection before Commissioning 44 7 2 Po...

Страница 6: ...ls are securely fastened using the specified torque and appropriate tools Failure to do so may result in product damage and any resulting damage will not be covered by the warranty Familiarize with th...

Страница 7: ...Prior to operating the product it is crucial to inspect and verify that the tools to be used have undergone regular maintenance 1 3 Electrical Connection Safety DANGER Before making electrical connec...

Страница 8: ...e safety instructions regarding PV strings and adhere to the regulations applicable to the local grid 1 4 Operation Safety DANGER Do not touch the enclosure of the ESS while it is running It is strict...

Страница 9: ...age before touching CAUTION To prevent misuse or accidents caused by unauthorized personnel prominently display warning signs or designate safety warning areas around the product NOTICE To avoid the r...

Страница 10: ...crystalline and poly crystalline Do not connect any PV array types other than these two types of PV modules to the energy storage system Do not connect the positive or negative terminal of the solar...

Страница 11: ...System And maximum Power level is 10kW 8 64 8 64kWh per Battery PACK HV High voltage battery 2 include two battery PACK or 8 64 2 kWh Battery 2 2 2 Appearance The image shown here is for reference onl...

Страница 12: ...User Manual 2 Product Description 7 Model W mm H mm D mm ESS10 8 64HV1 770 1415 208 ESS10 17 28HV2 770 1998 208 ESS10 8 64HV1 ESS10 17 28HV2 version 1 0 2024 3 29 www youth power net...

Страница 13: ...1 LED indicate CAPACITY Capacity indicator 2 E switch ON OFF 3 CAN bus Port CAN CAN bus and inverter connection port 4 RS485A Port RS485A RS485A and inverter connection port 5 PV1 PV1 PV2 PV2 PV3 PV3...

Страница 14: ...ce 6 DRM COM Communication connection for DRM DVC A 7 COM Test Port DVC A 8 Loads AC terminal for connection to the utility grid DVC C 9 EPS AC terminal reserved for Backup loads DVC C 10 GRID termina...

Страница 15: ...essional and qualified personnel are allowed to install and operate RoHS mark of conformity Regulatory compliance mark UKCA mark of conformity CE mark of conformity Do not dispose of the ESS together...

Страница 16: ...unication with host computer RS485B interface RS485 8P8C RJ45 Pin Definition Description RJ45 Pin Definition Description 1 RS485B_B 5 NC 2 RS485B_A 6 NC 3 NC 7 RS485B_A 4 NC 8 RS485B_B External commun...

Страница 17: ...ption 12 2 It is always on during normal operation displayed according to the set color except for red as shown in the figure below the lamp shade is displayed in green when set to green version 1 0 2...

Страница 18: ...User Manual 2 Product Description 13 3 Fault long red light bar red light flashes 1S 1 times when alarming 4 Charging running in cycle version 1 0 2024 3 29 www youth power net...

Страница 19: ...User Manual 2 Product Description 14 5 Discharging decreasing according to energy version 1 0 2024 3 29 www youth power net...

Страница 20: ...his product for such purposes The following statements outline our general policies concerning the ESS described in this document 1 For the ESS the electrical installation typically involves connectin...

Страница 21: ...and not discharge In this scenario the feed in power setting becomes ineffective and the DO function for optimized mode will be disabled Energy Management during Daytime The energy management system E...

Страница 22: ...the battery capacity is depleted or unable to sustain the load demand By combining the discharge capability of the battery and the EPS power from the grid the system ensures reliable and continuous po...

Страница 23: ...kers enable the ESS to extract the maximum available power from each PV string thereby enhancing overall system efficiency 3 2 1 Power Derating Power derating is implemented as a protective measure to...

Страница 24: ...ve Power Regulation The ESS offers reactive power regulation modes to provide grid support The specific reactive power regulation mode can be configured and adjusted through the SOLARMAN Smart App 3 3...

Страница 25: ...tlines the emergency charge conditions for different types of Li ion batteries table 3 1 EPS Charge Management for Li ion Battery BMS LED Status Conditions Trigger Either of the following conditions i...

Страница 26: ...g its protection The maximum allowable discharge current is limited to the lower value between the following The maximum discharge current specified by the inverter 100A The maximum recommended discha...

Страница 27: ...aging case When decommissioning the product it is recommended to store it in the original packaging case for safekeeping NOTICE Upon receiving the product it is important to conduct a thorough inspect...

Страница 28: ...ry Module 1 2 C Base 1 1 D Battery bracket 0 1 E Top Bracket 1 1 F LOAD Connector 1 1 G LOAD Connector Terminals 5 5 H AC Connector 1 1 I GRID Connector 1 1 J Communication Connector 2 2 K WIFI Stick...

Страница 29: ...ectric fields Avoid placing the product near items that may affect or damage it Store the product in a clean and dry location to prevent dust and water vapor from causing erosion Avoid storing the pro...

Страница 30: ...jury When moving the ESS be aware of its weight and keep the balance to prevent it from tilting or falling Wear proper protective equipment before performing operations on the ESS The bottom terminals...

Страница 31: ...rational noise it is not recommended to install the ESS in living areas 5 2 2 Carrier Requirements The mounting structure for the ESS must adhere to local national standards and guidelines The install...

Страница 32: ...ecurely fastened before releasing it CAUTION Please exercise caution to prevent personal injuries while handling the ESS Adhere to the following guidelines Ensure an adequate number of personnel are a...

Страница 33: ...the battery pack with 4 screws Step 2 Place the battery pack vertically and install 4 positioning pins on the battery pack Install the battery pack wall mount bracket using 4 screws After installing t...

Страница 34: ...inst the wall align it with the original expansion screw hole and use 4 screws to install the wall mount bracket for the inverter part of the battery pack After installing the battery wall bracket mar...

Страница 35: ...hang the hook on the back of the inverter onto the wall bracket and place it on top of the battery pack Use 4 screws to lock the inverter onto the battery pack Install and lock two locating pins Step...

Страница 36: ...uipment during electrical connections All cables used in the PV generation system must be securely attached adequately insulated and correctly sized NOTICE All electrical connections must adhere to lo...

Страница 37: ...l 6 Electrical Connection 32 6 2 The battery module connects to the inverter 6 2 1 Terminal Description All electrical terminals are located on the side of the inverter version 1 0 2024 3 29 www youth...

Страница 38: ...S connection GRID connection is the three phase four wire grid EPS connection L1 L2 L3 N and PE step 1 Follow step 1 2 3 4 5 to unscrew the swivel nut of the connector step 2 Strip 40 mm of the cable...

Страница 39: ...t back And press all wires onto the tubular terminals step 4 Connect L1 L2 L3 N PE to the corresponding position of the GRID EPS terminal and tighten it with the corresponding tool step 5 Follow Step...

Страница 40: ...phase four wire Loads connection L1 L2 L3 L4 and PE step 1 Follow step 1 2 3 4 5 to unscrew the swivel nut of the connector step 2 Strip 40 mm of the cable jacked and 12 mm L of the wire insulation S...

Страница 41: ...in relevant documents about PV strings WARNING Make sure the PV array is well insulated to ground before connecting it to the inverter Make sure the maximum DC voltage and the maximum short circuit cu...

Страница 42: ...lower than 0 5A WARNING Before connecting the PV array to the inverter ensure that the impedances between the positive terminals of the PV string and earth and between the negative terminals of the PV...

Страница 43: ...strings can be connected to PV2 or PV3 only and the other one cannot be used to connect other PV strings Prior to connecting the inverter to PV inputs the following electrical specifications must be...

Страница 44: ...mm 8 mm Step 2 Assemble the cable ends with the crimping pliers Step 3 Lead the cable through cable gland and insert the crimp contact into the insulator until it snaps into place Gently pull the cabl...

Страница 45: ...3 3 Installing the PV Connector Step 1 Rotate the DC switch to OFF position Step 2 Check the cable connection of the PV string for polarity correctness and ensure that the open circuit voltage in any...

Страница 46: ...anual 6 Electrical Connection step 4 Follow the foregoing steps to connect PV connectors of other PV strings step 5 Seal any unused PV terminal with a terminal cap version 1 0 2024 3 29 www youth powe...

Страница 47: ...the polarity of the optimizer cables is correct 6 4 WLAN RS485 Connection The WLAN RS485 module can upload the running information of the inverter to the corresponding APP so that users can check the...

Страница 48: ...inition Description RJ45 Pin Definition Description 1 RS485B_B 5 NC 2 RS485B_A 6 NC 3 NC 7 RS485B_A 4 NC 8 RS485B_B External communication CAN And RS485A interface CAN 8P8C RJ45 Pin Definition Descrip...

Страница 49: ...he ESS are intact and legible It is essential to complete these checks before starting the ESS to ensure safe and reliable operation e 7 2 Powering on the System If all the checklist items have been v...

Страница 50: ...account here Please note that use an email address to register for an account 7 5 Create a Plant Click Add Now to create your solar installation Please provide the necessary information about your sol...

Страница 51: ...right side and scan the barcode to enter the logger serial number You can locate the logger serial number on the external packaging or on the body of the logger itself 7 7 Network Configuration Step...

Страница 52: ...s not have any restrictions in place such as a white black list 4 Remove any special characters from the Wi Fi network name SSID or password 5 Reduce the distance between your phone and the device dur...

Страница 53: ...ith inverter 1 Light keeps on Logger connected to the inverter 2 Light off Connection to the inverter failed 3 On 1s Off 1s Slow flash Communicating with inverter READY Logger running status 1 Light o...

Страница 54: ...1 Stick logger does not have a network 2 Router WiFi signal strength weak 1 Check if the wireless network configured 2 Enhance router WiFi signal Strength Slow flash ON Slow flash Connection between...

Страница 55: ...50 User Manual 7 Commissioning 3 Long press Reset button for 10s restore factory settings version 1 0 2024 3 29 www youth power net...

Страница 56: ...shut down and allowed to cool down In addition always follow safety guidelines and refer to the manufacturer s instructions for specific procedures and precautions related to maintenance and service w...

Страница 57: ...e battery to the ESS Step 3 Wait for approximately 1 minute to allow for any residual voltage to dissipate Then use a multimeter to measure the voltage at the battery ports Step 4 If the battery port...

Страница 58: ...AC voltage 3 N PE 220V 380V 230V 400V 240V 415V AC voltage range 270V 480V Rated grid frequency 50Hz 60Hz Grid frequency range 45 55Hz 55 65Hz Harmonic THD of rated power 3 Power factor at Rated power...

Страница 59: ...Inverter high voltage box 770 205 777 65kg battery box 770 188 615 single 88kg Packaging size gross weight Inverter high voltage box 865 290 870 67kg battery box 865 285 678 single 90kg accessory box...

Отзывы: