
■EPDT-344a■
ES-10-100,ES-10-200
ES-11-100,ES-11-200
E
XPANSION
J
OINT
PRODUCT MANUAL
.
Thank you very much for choosing the Yoshitake’s product. To ensure the correct and safe use of the
product, please read this manual before use. This manual shall be kept with care for future references.
The symbols used in this manual have the following meanings.
Warning
This symbol indicates a potentially hazardous situation that, if not avoided,
could result in death or serious injury.
Caution
This symbol indicates a hazardous situation that, if not avoided, may result
in minor or moderate injury or may result in only property damage.
Table of Contents
1. Specifications ························································································· 1
2. Dimensions ··························································································· 2
3. Precautions before installation ··································································· 3
4. Installing anchors, guides and pipe supporting device
4.1 Load acting on the main anchor of straight pipe ········································ 4
4.2 Load acting on the main anchor at intermediate straight pipe of expansion
joints with different diameters ····························································· 4
4.3 Load acting on the main anchor of curved pipe ········································ 5
4.4 Load acting on intermediate anchors ······················································ 5
4.5 Caution on vertical piping ···································································· 5
4.6 Piping example ················································································· 6
5. Installation interval of guide elements for axial movements ··························· 7-8
6. Pipe supporting device ··········································································· 9
7. Installation of expansion joints
7.1 Number of expansion joints installed ···················································· 9-10
7.2 Adjustment of attaching face-to-face dimension ···································· 10
8. Operating Procedure ············································································· 11
Warranty Information