a 30-second purge is initiated. At the end of the purge, the GV 
is opened and the spark igniter is energized for 10 seconds. 
The ICB then checks for the presence of flame. If flame is 
detected, the ICB enters a flame stabilization period. If flame is 
not detected, the GV closes and a retry operation begins.

During the flame stabilization period, a loss of the flame for 2 
seconds causes the GV to close and the retry operation to 
begin. After the flame stabilization period, a loss of flame for 3/4 
second causes the GV to close and the retry operation to begin.

At the conclusion of the flame stabilization period, the ICB 
operates the gas heat in high fire for an additional 60 seconds, 
for a total for 120 seconds of high fire operation. After this 60 
seconds, the ICB then uses the call for the second stage of heat 
to control second stage operation of the GV.

When W1 is satisfied, both valves are closed.

Second stage of heating

When the ICB receives a call for the second stage of heating, 
W2, the ICB conducts a complete first stage ignition sequence. 
If this sequence is satisfied, the second main valve of the GV is 
opened.

When W2 is satisfied, the second main valve is closed.

Retry operation

When a flame is lost or is not detected during an attempt to 
achieve ignition, a retry operation occurs. A 30-second purge is 
performed between ignition attempts.

If the unit fails after three ignition attempts, the furnace is locked 
out for one hour. The furnace is monitored during this one-hour 
period for unsafe conditions.

Recycle operation

When a flame is lost after the flame stabilization period, a recy-
cle operation occurs. If the unit fails after five recycle attempts,
the furnace is locked out for one hour.

Gas heating operation errors

Lockout

A one-hour lockout occurs following three retries or five 
recycles. During the one-hour lockout, flame detection, limit 
conditions, and main valves are tested. Any improper results 
will cause the appropriate action to occur. Recycling the low 
voltage power cancels the lockout.

Temperature limit

If the UCB senses zero volts from the high temperature limit, 
the indoor blower motor is immediately energized. When the 
UCB again senses 24 volts from the temperature limit, the draft 
motor performs a 15-second post-purge and the indoor blower 
is de-energized following the elapse of the fan off delay for 
heating.

This limit is monitored regardless of unit operation status, that 
is, this limit is monitored at all times.

If the temperature limit opens three times within one hour, it 
locks on the indoor blower motor.

Flame sense

Flame sensing occurs at all times. If W1 is not present and a 
flame is sensed for 2 seconds, the draft motor is energized and 
the GV is kept off. The ICB halts any operation until a flame is 
not detected. Once the flame detection is lost, the ICB performs 
a post-purge. Normal operation is allowed concurrently with the 
purge. That is, this purge can be considered the purge 
associated with a call for W1.

If W1 is present, a flame is sensed but the GV is not energized 
and the draft motor is energized until the flame detection is lost. 
Normal operation is now allowed.

The flame detection circuitry continually tests itself. If the ICB 
finds the flame detection circuitry to be faulty, the ICB does not 
permit an ignition sequence and the draft motor is energized. If 
this failure occurs during an ignition cycle, the failure is counted 
as a recycle.

Gas valve

The UCB and ICB continuously monitor the GV.

If the ICB senses voltage at the GV when not requested, the 
ICB energizes the draft motor. The ICB does not operate the 
furnace until voltage is no longer sensed at the GV. The draft 
motor is stopped when voltage is not sensed at the GV.

Any time the UCB senses voltage at the GV without a call for 
heat for a continuous five-minute period, the UCB locks on the 
indoor blower. When voltage is no longer sensed at the GV, the 
UCB de-energizes the indoor blower following the elapse of the 
fan off delay for heating.

If voltage is sensed at the GV for at least 15 seconds during the 
fan on delay for heating and GV voltage or W1 is lost, the 
indoor blower is forced on for the length of the fan off delay for 
heating.

During a call for heat, if the UCB does not sense voltage at the 
GV for a continuous five-minute period, the UCB initiates a error 
message. The indoor blower motor is not locked on while there 
is no GV voltage.

Safety controls

The UCB monitors the temperature limit switch of gas heat 
units.

The control circuit includes the following safety controls:

Limit switch

The limit switch (LS) is located inside the gas heat compartment 
and is set to open at the temperature indicated in Table 13. It 
resets automatically. The limit switch operates when a high 
temperature condition, caused by inadequate supply air flow 
occurs. This shuts down the heater and energizes the blower.

Содержание ZV-06

Страница 1: ...wer specifications 56 23 Power exhaust specifications 56 24 Motor sheave datum diameters 58 25 3 stage dehumidification sequence in normal and alternate mode 62 26 Electric heat limit setting 64 27 El...

Страница 2: ...test edition Wear safety glasses and work gloves Use quenching cloth and have a fire extinguisher available during brazing operations Improper installation may create a condition where the operation o...

Страница 3: ...on combustible flooring or in the U S on wood flooring or Class A Class B or Class C roof covering materials For use with natural gas The unit can be converted to LP with a kit This product must be in...

Страница 4: ...onomizer B Economizer w Barometric RLF D Economizer w Power EXH H Motorized Damper Outdoor Air Option 1 No Service Options 2 DSC Disconnect Switch 3 NCO Non PWR Conv Outlet 4 PCO Powered Conv Outlet 5...

Страница 5: ...t air and combustion air intake hoods The unit must be operated under thermostatic control Return and supply air ducts must be sealed to the unit Air filters in place The unit furnace input rate and t...

Страница 6: ...ain a temperature rise within the range specified on the unit rating plate If components are added to a unit to meet local codes they are installed at the dealer s and or customer s expense The size o...

Страница 7: ...life Stainless steel option D High efficiency sine wave fin evaporator coil N Intelligent control board for safe and efficient operation E ECM outdoor fan motor O Slide out drain pan with 1 inch NPT c...

Страница 8: ...Applied voltage Outdoor DB temp Minimum Maximum Maximum F 06 6 5 ZV 208 230 3 60 187 252 125 460 3 60 432 504 125 07 7 5 ZV 208 230 3 60 187 252 125 460 3 60 432 504 125 08 8 5 ZV 208 230 3 60 187 25...

Страница 9: ...dling Exercise care when you move the unit Do not remove any packaging until the unit is near the place of installation To rig the unit attach chain or cable slings to the lifting holes provided in th...

Страница 10: ...ed Systems Figure 5 4 point and 6 point load weight for W units Figure 6 4 point and 6 point load weight for V units Figure 7 Center of gravity A LEFT D C FRONT B A LEFT B C D FRONT E F A D C B LEFT F...

Страница 11: ...ghts with the Magna Dry option Size tons Model Weight lbs Center of gravity 4 point load location lbs 6 point load location lbs Shipping Operating X Y A B C D A B C D E F 06 6 5 ZV 1293 1288 47 25 24...

Страница 12: ...rols Ducted Systems Figure 8 ZV 06 through 08 physical dimensions LEFT 59 00 A C D E F 4 19 27 31 89 00 21 19 FRONT SEE DETAIL B FOR DRAIN LOCATION 11 38 SEE DETAIL A FOR GAS INLET B 29 95 30 11 14 92...

Страница 13: ...ons Unit model number Dimension in A B C D E F ZV 06 ZV 07 ZV 08 42 89 22 1 8 18 3 16 15 3 16 6 3 16 ZV 10 ZV 12 50 3 4 119 1 2 30 3 16 24 3 16 17 3 16 6 3 16 15 23 29 03 14 85 29 03 14 85 15 23 28 86...

Страница 14: ...7 ZV 06 through 12 unit clearances Direction Distance in Direction Distance in Top1 1 Units must be installed outdoors Make sure that overhanging structures or shrubs do not obscure the condenser air...

Страница 15: ...unit bottom duct openings Bottom condensate drain Bottom gas supply entry FRONT RETURN AIR SUPPLY AIR RIGHT LEFT 20 1 8 19 1 8 17 1 8 6 13 16 6 13 16 32 11 16 14 1 2 16 3 8 18 1 16 25 9 16 12 5 16 27...

Страница 16: ...ohnson Controls Ducted Systems Figure 11 ZV 06 through 12 unit electrical entry Disconnect Swith Cover Power Entry 2 1 2 Control Entry 7 8 Power Entry 2 1 2 Convenience Outlet Cover Convenience Outlet...

Страница 17: ...able 8 ZV 06 through 08 side duct dimensions Unit model number Dimension in A B C D ZV 06 07 08 28 1 4 18 1 16 28 1 4 18 1 4 Table 9 ZV 10 through 12 side duct dimensions Unit model number Dimension i...

Страница 18: ...ZV 06 through 12 roof curb Table 10 Left end duct dimensions Unit model number Dimension in A B C ZV 06 07 08 30 358 22 580 22 330 ZV 10 12 30 358 22 580 22 330 4 5 16 A C B 8 or 14 50 1 2 30 20 20 80...

Страница 19: ...5567611 BIM B 1218 Johnson Controls Ducted Systems 19 Figure 14 ZV 06 through 12 transition roof curb 76 5 8 94 50 1 2 30 1 2 64 1 4 59 1 4 10 23 4 26 80 5 8 2 TYP FRONT RIGHT SUPPLY RETURN...

Страница 20: ...he following steps 1 Remove the side duct covers 2 Orient the supply panel with the painted surface up 3 Slide the supply panel between the heat exchanger and the unit bottom The painted surface must...

Страница 21: ...imes as much water as other oils designed for HCFC and CFC refrigerants Take all the necessary precautions to avoid exposure of the oil to the atmosphere POE polyolester compressor lubricants are know...

Страница 22: ...ced replacement wire must be of the type shown on the wiring diagram and the same minimum gauge as the replaced wire A disconnect must be used for these units Factory installed disconnects are availab...

Страница 23: ...it nameplate See Table 12 Electrical data on page 25 to size power wiring fuses and the disconnect switch Power wiring is brought into the unit through the side of the unit or the basepan inside the c...

Страница 24: ...NAL BLOCK TERMINALS ON A LIMITED NUMBER OF THERMOSTATS 1 4 3 1 2 4 Second stage heating not required on single stage he g units Jumper is required if there is no Smoke Detector circuit Jumper is requi...

Страница 25: ...e 48 3 53 8 60 60 E09 9 1 21 7 48 3 53 8 60 60 E18 18 2 43 3 60 6 67 5 70 70 E24 24 2 57 7 78 6 85 5 80 90 E36 34 2 81 8 108 8 115 6 110 125 460 5 7 6 4 38 41 9 10 1 6 2 6 2 2 None 22 7 24 9 25 30 E09...

Страница 26: ...175 460 8 5 8 5 66 1 66 1 13 13 1 6 4 7 2 2 None 30 2 32 4 35 40 E18 18 2 21 7 33 35 8 35 40 E24 24 2 28 9 42 44 8 45 45 E36 34 2 40 9 57 59 8 60 60 E54 54 2 65 70 9 73 6 80 80 1 Minimum Circuit Ampa...

Страница 27: ...None 52 7 58 2 60 70 E09 9 1 21 7 52 7 58 2 60 70 E18 18 2 43 3 66 1 73 70 80 E24 24 2 57 7 84 1 91 90 100 E36 34 2 81 8 114 3 121 1 125 125 460 5 7 6 4 38 41 9 10 1 6 4 7 2 2 None 24 8 27 30 30 E09 9...

Страница 28: ...460 8 5 8 5 66 1 66 1 13 13 1 6 6 6 2 2 None 32 1 34 3 40 40 E18 18 2 21 7 35 4 38 1 40 40 E24 24 2 28 9 44 4 47 1 45 50 E36 34 2 40 9 59 4 62 1 60 70 E54 54 2 65 73 3 76 80 90 1 Minimum Circuit Ampa...

Страница 29: ...E09 9 1 21 7 58 3 63 8 70 70 E18 18 2 43 3 73 1 80 80 80 E24 24 2 57 7 91 1 98 100 100 E36 34 2 81 8 121 3 128 1 125 150 460 5 7 6 4 38 41 9 10 1 6 2 6 2 2 20 None 27 7 29 9 30 35 E09 9 1 10 8 27 7 29...

Страница 30: ...3 175 175 460 8 5 8 5 66 1 66 1 13 13 1 6 4 7 2 2 20 None 35 2 37 4 40 45 E18 18 2 21 7 39 3 42 40 45 E24 24 2 28 9 48 3 51 50 60 E36 34 2 40 9 63 3 66 70 70 E54 54 2 65 77 1 79 9 90 90 1 Minimum Circ...

Страница 31: ...68 2 70 80 E09 9 1 21 7 62 7 68 2 70 80 E18 18 2 43 3 78 6 85 5 80 90 E24 24 2 57 7 96 6 103 5 100 110 E36 34 2 81 8 126 8 133 6 150 150 460 5 7 6 4 38 41 9 10 1 6 4 7 2 2 20 None 29 8 32 35 35 E09 9...

Страница 32: ...75 175 460 8 5 8 5 66 1 66 1 13 13 1 6 6 6 2 2 20 None 37 1 39 3 45 45 E18 18 2 21 7 41 6 44 4 45 45 E24 24 2 28 9 50 6 53 4 60 60 E36 34 2 40 9 65 6 68 4 70 70 E54 54 2 65 79 5 82 3 90 90 1 Minimum C...

Страница 33: ...Heat output K Btu 96 144 96 144 96 144 144 192 144 192 AFUE Steady state efficiency 80 80 80 80 80 80 80 80 80 80 No burners 4 6 4 6 4 6 6 8 6 8 No stages 23 23 23 23 23 23 23 23 23 23 Temperature ri...

Страница 34: ...rive evap fan data Quantity 1 1 1 1 1 Fan size inches 15 x 15 15 x 15 15 x 15 15 x 15 15 x 15 Type Centrifugal Centrifugal Centrifugal Centrifugal Centrifugal Motor sheave 1VL40 1VM50 1VL40 1VM50 1VM5...

Страница 35: ...r of gas flow required specific gravity of the gas and the length of run Follow the National Fuel Gas Code Z223 1 in U S A or the current Gas Installation Codes CSA B149 1 in Canada in all cases unles...

Страница 36: ...e dope sparingly to male threads only Clean all piping of dirt and scale Hammer on the outside of the pipe and blow out loose particles Before initial start up make sure that all gas lines external to...

Страница 37: ...eat Electric heaters are available as factory installed options or field installed accessories Refer to the electric heat instructions for installation These heaters mount in the heat compartment with...

Страница 38: ...e are two field installed power exhaust accessories 1 Down flow application 2 Horizontal flow application that requires the purchase of a barometric relief hood Rain hood For factory installed options...

Страница 39: ...r minimum position low speed fan When the VFD output is between the fan high speed and fan low speed settings the economizer damper is position proportionally between the economizer minimum position s...

Страница 40: ...economizer outside air dampers close until the supply air temperature rises above 49 F but does not go below the current economizer operating minimum position The economizer then modulates to control...

Страница 41: ...e number of cooling stages demanded Cooling stages set to one for single compressor unit With a stage 1 cooling demand Y1 input the economizer modulates to get SAT to VAV cooling supply air temperatur...

Страница 42: ...ure drops to less than 0 6 F above the operating cooling setpoint the staged percent command holds the current value If the operating space temperature drops 0 6 F or more below the operating cooling...

Страница 43: ...remains at 100 for 5 minutes and the SAT is greater than the operating VAV SAT setpoint 5 F the next available compressor energizes If the economizer position remains at 100 the process repeats every...

Страница 44: ...cts through circuit trace to 24V IN pin HOT C COM Mixed air temperature sensor input from 10K 77 F Type III negative temperature coefficient thermistor The MAT parameter reports input status F C 3 65...

Страница 45: ...tation sensor MOA Range parameter sets the cubic feet per minute liters per second measured by the air monitoring station sensor when it outputs 10 VDC Fr Air parameter reports input status 0 50000CFM...

Страница 46: ...o the 4 stage board and or fault detection diagnostics board 1 When wiring the unit and other devices using the SA Bus and FC Bus see Table 32 Smart Equipment economizer board analog outputs Location...

Страница 47: ...economizer actuator Connects through circuit trace to 24V IN pin COM EX FAN 24 VAC hot output to energize power exhaust fan contactor coil VFD enable relay coil ExFan parameter reports output status O...

Страница 48: ...ction force recommended for the belt section 5 Re tighten the belt nuts Figure 26 Belt adjustment CFM static pressure and power altitude and temperature corrections Use the information below to assist...

Страница 49: ...given is at an elevation of 5 000 ft The first step is to convert this static pressure to equivalent sea level conditions Sea level static pressure 0 6 832 0 72 in Enter the blower table at 1 400 sCF...

Страница 50: ...5 1 62 BHP exceeds the maximum continuous BHP rating of the 1 5 HP motor The 2 HP motor is required 6 1230 RPM is within the range of the 2 HP drives 7 Using the 2 HP motor and drive 5 turns open achi...

Страница 51: ...88 1 28 757 1 54 817 1 76 873 1 94 932 2 11 998 2 26 1078 2 41 1176 2 57 2 HP and field supplied drive ZV 07 7 5 Ton side duct Air flow CFM Available external static pressure IWG1 1 Blower performance...

Страница 52: ...2 63 1049 2 77 1106 2 91 1167 3 07 1232 3 25 4200 794 2 03 852 2 29 909 2 51 964 2 69 1019 2 85 1075 2 99 1133 3 13 1193 3 29 3 HP field supplied drive ZV 10 10 Ton side duct Air flow CFM Available e...

Страница 53: ...867 1 79 913 2 09 961 2 35 1011 2 60 1063 2 83 1116 3 04 1169 3 25 1222 3 45 4000 808 1 38 846 1 74 888 2 06 933 2 35 982 2 62 1032 2 86 1084 3 09 1137 3 31 1190 3 51 1242 3 71 4200 830 1 67 868 2 03...

Страница 54: ...2 23 2400 675 0 76 730 0 95 788 1 12 847 1 26 907 1 41 967 1 55 1025 1 71 1081 1 90 1132 2 11 1179 2 37 2600 694 0 91 749 1 10 807 1 27 866 1 41 926 1 56 986 1 70 1044 1 86 1100 2 05 1151 2 26 1198 2...

Страница 55: ...pplied drive ZV 12 12 5 Ton bottom duct Air flow CFM Available external static pressure IWG1 1 Blower performance includes gas heat exchangers and 2 in filters See the static resistance table for addi...

Страница 56: ...45 1VM50 AK74 N A 903 943 985 1028 1071 1113 10 10 ZV Standard 2 2 3 1VM50 AK84 N A 781 819 859 897 932 969 High static 3 3 45 1VM50 AK74 N A 903 943 985 1028 1076 1113 12 12 5 ZV Standard 3 3 45 1VM5...

Страница 57: ...across the unit This is the external static pressure ESP In order to obtain an accurate measurement verify that the air filters are clean 4 Determine the number of turns the variable motor sheave is...

Страница 58: ...in blower speed can result in substantial changes in static pressure and BHP BHP and AMP draw of the blower motor increase by the cube of the blower speed Static pressure increases by the square of th...

Страница 59: ...0 08 0 09 0 10 0 13 2500 0 08 0 10 0 23 0 16 0 08 0 09 0 10 0 11 0 14 2700 0 10 0 11 0 29 0 17 0 09 0 10 0 12 0 13 0 16 2900 0 12 0 12 0 34 0 19 0 10 0 11 0 13 0 14 0 18 3100 0 15 0 13 0 40 0 20 0 12...

Страница 60: ...ressors that are energized remain energized and the economizer dampers are modulated to maintain supply air temperature to within 1 degree of the cooling SAT lower setpoint If the output to the econom...

Страница 61: ...es within two hours of operation the UCB locks out the compressor Low ambient cooling To determine when to operate in low ambient mode the UCB has an outdoor air temperature sensor OAT with a low ambi...

Страница 62: ...and there is not a call for cooling the UCB energizes solenoids SOL 3 HGRH SOL 2 and the reheat relay RHR which de energizes SOL 1 The unit then operates with refrigerant flow in the evaporator reheat...

Страница 63: ...reduces the amount of over cooling while maintaining humidity control in the space The aux mode is only applicable when the unit is set up in the alternate reheat mode Evaporator Coil TXV Check Valve...

Страница 64: ...heat limit setting on page 64 It resets automatically The limit switch operates when a high temperature condition caused by inadequate supply air flow occurs This shuts down the heater and energizes t...

Страница 65: ...ed following the elapse of the fan off delay for heating This limit is monitored regardless of unit operation status that is this limit is monitored at all times If the temperature limit opens three t...

Страница 66: ...cipator setpoints The anticipator setpoint must be correct Too high of a setting results in longer heat cycles and a greater temperature swing in the conditioned space Reducing the value below the cor...

Страница 67: ...calling for second stage 100 input heat 3 Measure the time needed for one revolution of the hand on the smallest dial on the meter A typical gas meter has a 1 2 or a 1 cubic foot test dial 4 Using th...

Страница 68: ...e manifold pressure or counterclockwise to decrease manifold pressure Note Do not to over fire the unit on second stage 7 After you check the high manifold pressure adjust the thermostat to call for f...

Страница 69: ...l flame Figure 32 Typical two stage gas valve Navigation components for the Smart Equipment control board The following components are needed to access the control points in the Smart Equipment contro...

Страница 70: ...e also effective for economizer free cooling supply air temperature reset when the ClgStgs parameter is set for 1 or more G Continuous indoor blower request 24 VAC input switched from R OCC Occupancy...

Страница 71: ...erminate temporary occupancy COM Common for ST and SSO inputs Negative of VDC circuit for ST and SSO inputs SSO Space Sensor Offset input from 0 to 20K potentiometer Positive of VDC circuit 3 625 VDC...

Страница 72: ...hot return from Air Proving Switch When this optional input is enabled the air proving switch must close within 30 seconds of initiation of indoor blower operation and not open for greater than 10 se...

Страница 73: ...ntilation cooling reheat or heat pump heating demands C2 24 VAC hot output for compressor 2 Not effective for one stage compressor UCBs If demand is present and permissions allow compressor 2 operatio...

Страница 74: ...f the 15 VDC reading to C circuit for powering an optional netstat and or Multi Touch gateway C Common for SA BUS power and communication circuits Also incorporated in the J8 6 pin phone jack connecto...

Страница 75: ...than FC bus BACnet MSTP communication circuit FC FC Field Connected BUS BACnet MSTP communication Positive of the VDC typically a fluctuating 1 5 to 3 5 volts reading to COM at least 0 25 volts lower...

Страница 76: ...2 AWG stranded shielded cable A 22 gauge cable offers the best performance for various baud rates cable distances and number of trunk devices primarily due to lower conductor to conductor capacitance...

Страница 77: ...355 97 19 80 61 400 CFM ton 80 72 75 155 70 271 77 17 80 63 85 161 69 305 86 16 80 64 95 164 68 354 97 15 80 65 400 CFM ton 75 62 75 134 57 264 77 22 75 53 85 135 57 308 86 21 75 54 95 137 57 353 96...

Страница 78: ...71 263 78 17 80 63 85 166 70 304 88 17 80 64 95 169 70 350 97 16 80 64 400 CFM ton 75 62 75 139 58 255 80 22 75 53 85 142 57 296 90 21 75 54 95 144 57 342 98 21 75 54 Air flow Indoor Db Wb Outdoor DB...

Страница 79: ...2 279 75 17 80 63 85 159 71 319 85 16 80 64 95 162 70 364 95 16 80 64 400 CFM ton 75 62 75 135 57 268 75 22 75 53 85 138 56 308 85 21 75 54 95 140 56 354 95 21 75 54 Air flow Indoor Db Wb Outdoor DB S...

Страница 80: ...0 267 77 17 80 63 85 160 69 310 87 16 80 64 95 165 68 358 98 15 80 65 400 CFM ton 75 62 75 132 55 259 77 22 75 53 85 135 54 304 86 21 75 54 95 138 53 349 96 20 75 55 Air flow Indoor Db Wb Outdoor DB S...

Страница 81: ...9 279 76 16 80 64 85 160 67 322 86 16 80 64 95 165 66 370 96 15 80 65 400 CFM ton 75 62 75 133 54 271 76 22 75 53 85 136 54 314 86 21 75 54 95 140 54 363 96 20 75 55 Air flow Indoor Db Wb Outdoor DB S...

Страница 82: ...WLDO VWDUW XS 7KLV FRQILGHQFH LV VXSSRUWHG E WKH GD GHDOHU SURWHFWLRQ FRYHUDJH SRUWLRQ RI RXU VWDQGDUG ZDUUDQW SROLF ZKLFK VWDWHV WKDW RKQVRQ RQWUROV XFWHG 6 VWHPV ZLOO FRYHU SDUWV DQG ODERU RQ QHZ HT...

Страница 83: ...LQ WKH IXOO RSHQ SRVLWLRQ DQG WKH IUHTXHQF GULYH LV RSHUDWLQJ DW R QRW SURFHHG ZLWK WKH HTXLSPHQW VWDUW XS ZLWKRXW WKH GHVLJQ 0 LQIRUPDWLRQ HVLJQ 6XSSO LU 0 BBBBBBBBBBBBBBBBBBBBBBBBBB HVLJQ 5HWXUQ LU...

Страница 84: ...RPSOHWH LU 0RYLQJ QVSHFWLRQ RPSOHWHG 6HH 1RWHV OLJQPHQW RI GULYH FRPSRQHQWV HOW WHQVLRQ DGMXVWHG SURSHUO ORZHU SXOOH V WLJKW RQ VKDIW EHDULQJ VHW VFUHZV WLJKW ZKHHO WLJKW WR VKDIW 3UHVVXUH VZLWFK RU W...

Страница 85: ...JH UHTXLUHG WR REWDLQ WKH FRUUHFW DLUIORZ DV LW QHFHVVDU WR LQFUHDVH RI GHFUHDVH WKH DLUIORZ WR PHHW WKH GHVLJQ FRQGLWLRQV I WKH PRWRU SXOOH VL H ZDV FKDQJHG PHDVXUH WKH RXWVLGH GLDPHWHUV RI WKH PRWRU...

Страница 86: ...BB 5 5HWXUQ LU 7HPSHUDWXUH BBBBBBBBBBBBBBBB GE BBBBBBBBBBBBBBBB ZE BBBBBBBBBBBBBBBB 5 0L HG LU 7HPSHUDWXUH BBBBBBBBBBBBBBBB GE BBBBBBBBBBBBBBBB ZE BBBBBBBBBBBBBBBB 5 6XSSO LU 7HPSHUDWXUH BBBBBBBBBBBBB...

Страница 87: ...BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB...

Отзывы: