Cooling Sequence Of Operation

For the ZK series of units, the thermostat makes a circuit 
between "R" and "Y1" for the first stage of cooling.

The call is passed through the 

Unit Control Board (UCB),

 

which then determines whether the requested operation is 
available and, if so, which components to energize.

If at any time a call for both heating and cooling are present, the 
heating operation will be performed. If operating, the cooling 
system is halted as with a completion of a call for cooling. 
Heating always takes priority.

Continuous Blower

By setting the room thermostat fan switch to "ON," the supply 
air blower will operate continuously.

Intermittent Blower

With the room thermostat fan switch set to "AUTO" and the 
system switch set to either the "AUTO" or "HEAT" settings, the 
blower is energized whenever a cooling or heating operation is 
requested. The blower is energized after any specified delay 
associated with the operation.

When energized, the indoor blower has a minimum run time of 
30 seconds. Additionally, the indoor blower has a delay of 10 
seconds minimum off.

No Outdoor Air Options

When the thermostat calls for cooling, the low-voltage control 
circuit from “R” to “Y1” and “G” is completed. The compressor and 
condenser fan motor are energized. After completing the specified 
fan on delay for cooling, the UCB will energize the blower motor.

Once the thermostat has been satisfied, it will de-energize Y1. If 
the compressor has satisfied its minimum run time, the 
compressor and condenser fan de-energize. Otherwise, the 
unit operates the cooling system until the minimum run time for 
the compressor has been completed. After the compressor de-
energizes, the blower is stopped following the elapse of the fan 
off delay for cooling.

To be available, a compressor must not be locked-out due to a 
high or low-pressure switch or freezestat trip and the anti-short 
cycle delay (ASCD) must have elapsed.

Economizer With Single Enthalpy Sensor

When the room thermostat calls for cooling, the low voltage 
control circuit from “R” to “G” and “Y1” is completed. The UCB 
energizes the blower motor (if the fan switch on the room 
thermostat is set in the “AUTO” position) and drives the 
economizer dampers from fully closed to their minimum position. 
If the enthalpy of the outdoor air is below the setpoint of the 
enthalpy controller (previously determined), “Y1” energizes the 
economizer. The dampers will modulate to maintain a constant 
supply air temperature as monitored by the discharge air sensor. 

If the outdoor air enthalpy is above the setpoint, “Y1” energizes 
the compressor and condenser fan motor only.

When there is a call for “Y2”, the low voltage control circut from 
“R” to “Y2 is completed. The UCB energizes the compressor. If 
the outdoor air is below the set point fo the enthalpy controller 
“Y2” will energize the compressor to supplement the 
economizer.

Once the thermostat has been satisfied, it will de-energize “Y1 
and Y2”. If the compressor has satisfied its minimum run time, 
the compressor and condenser fan are de-energized. Otherwise, 
the unit operates the cooling system until the minimum run times 
for the compressor has been completed. After the compressor 
de-energizes, the blower is stopped following the elapse of the 
fan off delay for cooling, and the economizer damper goes to the 
closed position. If the unit is in continuous fan operation the 
economizer damper goes to the min. position.

Economizer With Dual Enthalpy Sensors

The operation with the dual enthalpy sensors is identical to the 
single sensor except that a second enthalpy sensor is mounted 
in the return air. This return air sensor allows the economizer to 
choose between outdoor air and return air, whichever has the 
lowest enthalpy value, to provide maximum operating 
efficiency.

Economizer With Power Exhaust

A unit equipped with an economizer (single or dual enthalpy) 
and a power exhaust operates as specified above with one 
addition. The power exhaust motor is energized 45 seconds 
after the actuator position exceeds the exhaust fan set point on 
the economizer control. As always, the "R" to "G" connection 
provides minimum position but does not provide power exhaust 
operation.

Motorized Outdoor Air Dampers

This system operation is the same as the units with no outdoor 
air options with one exception. When the "R" to "G" circuit is 
complete, the motorized damper drives open to a position set 
by the thumbwheel on the damper motor. When the "R" to "G" 
circuit is opened, the damper spring returns fully closed.

Cooling Operation Errors

Each  cooling  system  is  monitored  for  operation  outside  of  the
intended parameters. Errors are handled as described below. All
system errors override minimum run times for compressors.

NOTE: 

The following components are needed to access the 
control points in the Smart Equipment™ control. 

1.

Local LCD on Unit Control Board.

OR

2.

Mobile Access Portal (MAP) Gateway (Portable).

• Source 1 P/N S1-JC-MAP1810-OP
• MAP Gateway Quick Start Guide P/N 24-10737-16
• MAP Gateway Instruction P/N 24-10737-8

Содержание ZK Series

Страница 1: ...thru A5 Bottom Duct Application 41 19 RPM Selection 42 20 Indoor Blower Specifications 42 21 Power Exhaust Specifications 42 22 Motor Sheave Datum Diameters 44 23 Additional Static Resistance 45 24 El...

Страница 2: ...test edition Wear safety glasses and work gloves Use quenching cloth and have a fire extinguisher available during brazing operations Improper installation may create a condition where the operation o...

Страница 3: ...d directly on combustible flooring or in the U S on wood flooring or Class A Class B or Class C roof covering materials 4 For use with natural gas convertible to LP with kit This product must be insta...

Страница 4: ...erv 13 4 Coil Guard CG STD Filter 5 2 Pleated Filter CG 6 4 Pleated Filter CG A Std Cabinet E SSD SST Drain Pan R Reverse Drain Pan A No Economizer B Economizer w Barometric RLF D Economizer w Power E...

Страница 5: ...Bracket 2 Turn each bracket toward the ground and the protective plywood covering will drop to the ground 3 Remove the condenser coil external protective covering prior to operation 4 Remove the tooll...

Страница 6: ...operate the cooling system down to 0 F when this product is applied in a comfort cooling application for people An economizer is typically included in this type of application When applying this prod...

Страница 7: ...the unit is near the place of installation Rig the unit by attaching chain or cable slings to the lifting holes provided in the base rails Spreader bars whose length exceeds the largest dimension acr...

Страница 8: ...s Center of Gravity 4 Point Load Location lbs 6 Point Load Location lbs Shipping Operating X Y A B C D A B C D E F A3 3 ZK 851 846 47 25 24 00 161 183 266 235 105 114 124 181 167 154 A4 4 ZK 870 865 4...

Страница 9: ...Johnson Controls Ducted Systems 9 Figure 8 ZK A3 Physical Dimensions 25 31 59 00 15 51 29 75 59 LEFT 11 3 8 21 3 16 89 27 5 16 4 3 16 FRONT See detail A for gas inlet A See detail B for drain locatio...

Страница 10: ...Controls Ducted Systems Figure 9 ZK A4 thru A5 Physical Dimensions 24 47 TYP 2 PL 15 38 15 38 59 00 15 25 29 69 59 LEFT 11 3 8 21 3 16 89 27 5 16 4 3 16 FRONT See detail A for gas inlet A See detail B...

Страница 11: ...3 16 15 3 16 6 3 16 42 CABINET 3 126 2 000 3 184 4 727 7 705 14 594 Gas Pipe Inlet Gas Exhaust Vent 5 3 8 1 FPT Table 5 ZK A3 thru A5 Unit Clearances Direction Distance in Direction Distance in Top1 1...

Страница 12: ...Unit Bottom Duct Openings Bottom condensate drain Bottom gas supply entry FRONT RETURN AIR SUPPLY AIR RIGHT LEFT 20 1 8 19 1 8 17 1 8 6 13 16 6 13 16 32 11 16 14 1 2 16 3 8 18 1 16 25 9 16 12 5 16 27...

Страница 13: ...ith Cover Power Entry 2 1 2 Control Entry 7 8 Power Entry 2 1 2 Convenience Outlet Cover Convenience Outlet Power Entry 7 8 FRONT Dot Plugs 5 5 32 31 11 16 2 31 32 18 1 4 Return Air Supply Air A B C D...

Страница 14: ...ru A5 Roof Curb 4 5 16 A C B Table 7 Left End Duct Dimensions Unit Model Number Dimension in A B C ZK A3 30 357 13 365 22 516 ZK A4 30 357 13 365 22 516 ZK A5 30 357 13 365 22 516 8 or 14 50 1 2 30 20...

Страница 15: ...r bottom duct application no duct cover changes are necessary For side duct application remove the side duct covers and install over the bottom duct openings The panels removed from the side duct conn...

Страница 16: ...ing must conform to local codes Use a sealing compound on male pipe threads Install condensate drain line from the 1 inch NPT female connection on the unit to an open drain Figure 20 Condensate Drain...

Страница 17: ...red If any of the wire supplied with the unit must be replaced replacement wire must be of the type shown on the wiring diagram and the same minimum gauge as the replaced wire A disconnect must be uti...

Страница 18: ...he unit nameplate Refer to Electrical Data Table 9 to size power wiring fuses and disconnect switch Power wiring is brought into the unit through the side of the unit or the basepan inside the curb Fi...

Страница 19: ...F THERMOSTATS 1 4 3 1 4 Second stage ot required on single stage he g units Jumper is required for any co of R RC or RH 5 5 OCC is an output from the thermostat to indicate the Occupied on X is an inp...

Страница 20: ...4 45 8 52 6 50 60 E20 15 2 41 6 58 5 65 4 60 70 230 13 8 83 1 22 2 1 5 2 5 5 None 26 7 32 2 35 45 E06 6 1 14 4 26 7 32 2 35 45 E08 9 1 21 7 33 6 40 5 40 45 E15 15 2 36 1 51 6 58 5 60 60 E20 20 2 48 1...

Страница 21: ...1 12 5 26 7 32 2 35 45 E08 6 8 1 18 9 30 1 37 40 45 E15 11 3 2 31 4 45 8 52 6 50 60 E20 15 2 41 6 58 5 65 4 60 70 230 13 8 83 1 22 2 1 5 2 5 5 None 26 7 32 2 35 45 E06 6 1 14 4 26 7 32 2 35 45 E08 9...

Страница 22: ...5 1 12 5 36 7 42 2 50 50 E08 6 8 1 18 9 42 6 49 5 50 50 E15 11 3 2 31 4 58 3 65 1 60 70 E20 15 2 41 6 71 77 9 80 80 230 13 8 83 1 22 2 1 5 2 5 5 20 None 36 7 42 2 50 50 E06 6 1 14 4 37 43 9 50 50 E08...

Страница 23: ...5 1 12 5 36 7 42 2 50 50 E08 6 8 1 18 9 42 6 49 5 50 50 E15 11 3 2 31 4 58 3 65 1 60 70 E20 15 2 41 6 71 77 9 80 80 230 13 8 83 1 22 2 1 5 2 5 5 20 None 36 7 42 2 50 50 E06 6 1 14 4 37 43 9 50 50 E08...

Страница 24: ...8 No stages 1 1 1 1 1 1 1 1 1 Temperature Rise Range F 20 50 F 25 65 F 50 80 F 20 50 F 25 65 F 50 80 F 25 65 F 35 65 F 45 75 F Gas Limit Setting F 235 200 255 235 200 255 200 245 240 Gas piping conne...

Страница 25: ...ntrifugal Centrifugal Centrifugal Motor Sheave 1VP34 1VL44 1VP34 1VL44 1VP34 1VL44 Blower Sheave AK61 AK59 AK61 AK59 AK61 AK59 Belt A47 A47 A47 A47 A47 A47 Motor HP each 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2...

Страница 26: ...2 22 21 22 22 22 22 22 Temperature Rise Range F 20 50 F 25 65 F 50 80 F 20 50 F 25 65 F 50 80 F 25 65 F 35 65 F 45 75 F Gas Limit Setting F 235 200 255 235 200 255 200 245 240 Gas piping connection in...

Страница 27: ...ntrifugal Centrifugal Centrifugal Motor Sheave 1VP34 1VL44 1VP34 1VL44 1VP34 1VL44 Blower Sheave AK61 AK59 AK61 AK59 AK61 AK59 Belt A47 A47 A47 A47 A47 A47 Motor HP each 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2...

Страница 28: ...ith the local gas utility Figure 23 Side Entry Gas Piping NOTE Routing of gas piping must not interfere with the flue or heat compartment access Figure 24 Bottom Entry Gas Piping NOTE Maximum capacity...

Страница 29: ...del numbers 1NP0454 or 1NP0455 All LP gas equipment must conform to the safety standards of the National Fire Protection Association Table 13 Gas Heat Minimum Supply Air Size Tons Model Heat Size Supp...

Страница 30: ...t least once a year For specific troubleshooting and maintenance procedures please refer to the smoke detector s installation instructions which accompanies the unit Motorized Outdoor Damper The Motor...

Страница 31: ...y fan system both set points should be set to the same value Free Cooling Four types of free cooling options are available dry bulb changeover single enthalpy dual enthalpy changeover and Auto Dry Bul...

Страница 32: ...e stage of cooling If the economizer output goes to minimum position and the SAT is less than Economizer Setpoint 1 F the control starts a 12 minute timer to de energize a compressor output If at any...

Страница 33: ...mistor MAT parameter reports input status F C 3 65 VDC reading MAT to COM with open circuit Read only use in current control revision IN1 MAT LEDs at left on upper edge of economizer board POWER POWER...

Страница 34: ...power exhaust actuator and economizer actuator Connects through circuit trace to 24V IN pin HOT ECON 2 10 VDC output for the Economizer actuator Econ parameter reports output status 0 100 Used to posi...

Страница 35: ...egative for the indoor air quality sensor Connects through circuit trace to 24V IN pin COM R 24V 24 VAC hot supplied for the outdoor air quality sensor Connects through circuit trace to 24V IN pin HOT...

Страница 36: ...ield supplied disconnect to obtain proper rotation Blower Rotation Check for proper supply air blower rotation If the blower is rotating backwards the line voltage at the unit point of power connectio...

Страница 37: ...e the air at high altitude is less dense less static pressure will be generated and less power will be required than a similar application at sea level Air density correction factors are shown in Tabl...

Страница 38: ...iven is at an elevation of 5 000 ft The first step is to convert this static pressure to equivalent sea level conditions Sea level static pressure 0 6 832 0 72 Enter the blower table at 1 400 sCFM and...

Страница 39: ...r and drive 5 turns open will achieve 1230 RPM Example Supply Air Blower Performance Air Flow CFM Available External Static Pressure IWG 0 2 0 4 0 6 0 8 1 0 1 2 1 4 1 6 1 8 2 0 RPM BHP RPM BHP RPM BHP...

Страница 40: ...627 0 5 719 0 6 801 0 6 876 0 7 943 0 8 1005 0 9 1063 1 0 1117 1 1 1169 1 2 1400 537 0 5 639 0 5 731 0 6 813 0 7 888 0 7 955 0 8 1017 0 9 1075 1 0 1129 1 1 1181 1 2 1500 549 0 5 650 0 6 742 0 6 824 0...

Страница 41: ...7 0 8 942 0 8 994 0 9 1046 1 0 1100 1 2 1157 1 3 1400 617 0 5 705 0 6 781 0 6 847 0 7 907 0 8 962 0 9 1014 1 0 1066 1 1 1119 1 2 1177 1 3 1500 637 0 6 724 0 6 800 0 7 867 0 8 927 0 8 981 0 9 1034 1 0...

Страница 42: ...on Size Tons Model Airflow Option HP Max BHP Motor Sheave Blower Sheave 6 Turns Open 5 Turns Open 4 Turns Open 3 Turns Open 2 Turns Open 1 Turn Open Fully Closed A3 3 0 ZK Std 1 5 1 5 1VP34 AK61 N A 5...

Страница 43: ...motor sheave is open 5 Select the correct blower performance table for the unit from Tables 17 and 18 Tables are presented for side and down flow configuration 6 Determine the unit Measured CFM from...

Страница 44: ...llation errors leaks or undesirable systems effects that can result in loss of airflow Even small changes in blower speed can result in substantial changes in static pressure and BHP BHP and AMP draw...

Страница 45: ...2 0 03 0 01 0 01 0 01 0 02 0 02 0 02 1200 0 04 0 00 0 04 0 01 0 01 0 01 0 02 0 02 0 02 1300 0 03 0 01 0 05 0 01 0 01 0 01 0 03 0 03 0 03 1400 0 03 0 03 0 07 0 02 0 02 0 02 0 03 0 03 0 03 1500 0 03 0 0...

Страница 46: ...onomizer The dampers will modulate to maintain a constant supply air temperature as monitored by the discharge air sensor If the outdoor air enthalpy is above the setpoint Y1 energizes the compressor...

Страница 47: ...calling for cooling the UCB will operate in the low ambient mode Low ambient mode operates the compressors in this manner 10 minutes on 5 minutes off The indoor blower is operated throughout the cycl...

Страница 48: ...the unit continues to operate with refrigerant flow in the reheat coil and condenser coil 1 See Figure 29 Indoor blower operation is initiated upon a call for first stage cooling second stage cooling...

Страница 49: ...The control circuit includes the following safety controls Limit Switch LS This control is located inside the heater compartment and is set to open at the temperature indicated in the Electric Heat L...

Страница 50: ...attempts the furnace is locked out for one hour The furnace is monitored during this one hour period for unsafe conditions Recycle Operation When a flame is lost after the flame stabilization period a...

Страница 51: ...r 2 seconds the GV will be de energized the ignition cycle is aborted and the ICB flashes the appropriate code See Table 31 Ignition Control Flash Codes The draft motor is energized until the pressure...

Страница 52: ...k for correct manifold gas pressures See CHECKING GAS INPUT 3 Check the supply gas pressure It must be within the limits shown on the rating nameplate Supply pressure should be checked with all gas ap...

Страница 53: ...a 1 cubic foot test dial 5 Using the number of seconds it takes for one revolution of the dial calculate the cubic feet of gas consumed per hour See example below 6 If necessary adjust the low pressur...

Страница 54: ...unit on first stage 9 Once pressure has been checked replace the plastic cap covering the HI and LO pressure adjustment screws NOTE When using natural gas the manifold pressure for second stage 100 i...

Страница 55: ...ource 1 P N S1 JC MAP1810 OP 3 MAP Gateway Quick Start Guide P N 24 10737 16 4 MAP Gateway Instruction P N 24 10737 8 For more information on the Smart Equipment unit control board navigation refer to...

Страница 56: ...microprocessor connects through circuit trace to the SD 24 terminal SD 24 24 VAC hot out for factory accessory smoke detector condensate overflow and or user shutdown relay switching in series Connec...

Страница 57: ...t indicates 24 VAC is present at C and 24V terminals FAULT Red hard lockout networking error and firmware error indicator 1 2 second on off flashing indicates one or more alarm is currently active 1 1...

Страница 58: ...C reading EC2 to EC2 with open circuit Used in suction line temperature safety Pinned connections on right edge of UCB RAH Return Air Humidity input from 0 10 VDC 0 100 RH sensor Input required for re...

Страница 59: ...ut for indoor blower contactor coil indoor blower VFD enable relay coil Output with heat cool operation G input or schedule demand C1 24 VAC hot output for compressor 1 If demand is present and permis...

Страница 60: ...er of the board Positive of the 15 VDC reading to C circuit for powering an optional netstat and or Multi Touch gateway C Common for SA BUS power and communication circuits Also incorporated in the J8...

Страница 61: ...indicates the UCB is supplying power to the communication sub board 1 When wiring unit and other devices using the SA Bus and FC Bus see Table 30 Table 29 Smart Equipment UCB Details Continued Descri...

Страница 62: ...incline manometer digital manometer or Magnehelic gauge teed into the pressure switch sensing line verify that the negative pressure exceeds the setting listed on the induced draft pressure switch lab...

Страница 63: ...16 6 7 95 171 71 383 102 14 7 3 400 Cfm Ton 75 63 75 138 62 288 82 21 6 3 85 141 62 321 90 20 6 7 95 144 61 372 98 18 7 2 Table 33 ZK A4 Charging Table Air Flow Indoor Db Wb Outdoor DB Suction Pressur...

Страница 64: ...70 114 26 8 4 300 Cfm Ton 80 72 75 140 59 376 97 28 7 2 85 145 61 425 106 26 7 9 95 150 63 475 115 24 8 5 300 Cfm Ton 75 62 75 135 57 368 95 25 7 2 85 135 57 415 104 25 7 8 95 136 57 461 112 25 8 4 40...

Страница 65: ...WLDO VWDUW XS 7KLV FRQILGHQFH LV VXSSRUWHG E WKH GD GHDOHU SURWHFWLRQ FRYHUDJH SRUWLRQ RI RXU VWDQGDUG ZDUUDQW SROLF ZKLFK VWDWHV WKDW RKQVRQ RQWUROV XFWHG 6 VWHPV ZLOO FRYHU SDUWV DQG ODERU RQ QHZ HT...

Страница 66: ...LQ WKH IXOO RSHQ SRVLWLRQ DQG WKH IUHTXHQF GULYH LV RSHUDWLQJ DW R QRW SURFHHG ZLWK WKH HTXLSPHQW VWDUW XS ZLWKRXW WKH GHVLJQ 0 LQIRUPDWLRQ HVLJQ 6XSSO LU 0 BBBBBBBBBBBBBBBBBBBBBBBBBB HVLJQ 5HWXUQ LU...

Страница 67: ...RPSOHWH LU 0RYLQJ QVSHFWLRQ RPSOHWHG 6HH 1RWHV OLJQPHQW RI GULYH FRPSRQHQWV HOW WHQVLRQ DGMXVWHG SURSHUO ORZHU SXOOH V WLJKW RQ VKDIW EHDULQJ VHW VFUHZV WLJKW ZKHHO WLJKW WR VKDIW 3UHVVXUH VZLWFK RU W...

Страница 68: ...JH UHTXLUHG WR REWDLQ WKH FRUUHFW DLUIORZ DV LW QHFHVVDU WR LQFUHDVH RI GHFUHDVH WKH DLUIORZ WR PHHW WKH GHVLJQ FRQGLWLRQV I WKH PRWRU SXOOH VL H ZDV FKDQJHG PHDVXUH WKH RXWVLGH GLDPHWHUV RI WKH PRWRU...

Страница 69: ...BB 5 5HWXUQ LU 7HPSHUDWXUH BBBBBBBBBBBBBBBB GE BBBBBBBBBBBBBBBB ZE BBBBBBBBBBBBBBBB 5 0L HG LU 7HPSHUDWXUH BBBBBBBBBBBBBBBB GE BBBBBBBBBBBBBBBB ZE BBBBBBBBBBBBBBBB 5 6XSSO LU 7HPSHUDWXUH BBBBBBBBBBBBB...

Страница 70: ...BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB...

Отзывы: