
FORM 160.87-OM1
ISSUE DATE: 8/24/2018
JOHNSON CONTROLS
64
SECTION 2 - OPTIVIEW CONTROL CENTER INTRODUCTION
OVERVIEW
This screen displays a cutaway view of the chiller com-
pressor, revealing the Pre-Rotation Vanes and provides the
capability of calibrating the Pre-Rotation Vanes for either
Variable Speed Drive or Hot Gas Bypass applications.
Requires a login access level of SERVICE.
DISPLAY ONLY
Pre-Rotation Vanes Opening (LED)
Indicates the vanes are opening.
Pre-Rotation Vanes Closing (LED)
Indicates the vanes are closing.
Calibration in Progress (LED)
Indicates the calibration sequence is in progress.
Calibration Messages
These are text messages which step the user through the
calibration process and indicate its success or failure.
Pre-Rotation Vanes Voltage
Displays the Pre-Rotation Vanes position potentiom-
eter feedback voltage.
PROGRAMMABLE
Start Calibration
Access Level Required: SERVICE
This option is hidden after calibration has started.
Cancel Calibration
Access Level Required: SERVICE
This option only becomes available after calibration
has started.
NAVIGATION
Home
Access Level Required: VIEW
Returns user to HOME Screen.
Compressor
Access Level Required: VIEW
Returns user to COMPRESSOR Screen.
PRE-ROTATION VANES CALIBRATION SCREEN
LD20148
FIGURE 24 -
PRE-ROTATION VANES CALIBRATION SCREEN
Содержание YK-EP B
Страница 10: ...FORM 160 87 OM1 ISSUE DATE 8 24 2018 JOHNSON CONTROLS 10 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 184: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 200: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 224: ...FORM 160 87 OM1 ISSUE DATE 8 24 2018 JOHNSON CONTROLS 224 NOTES...