
JOHNSON CONTROLS
39
SECTION 3 – HANDLING, STORAGE, INSTALLATION AND REASSEMBLY
FORM 155.33-ICOM2.EN.GB
ISSUE DATE:12/4/2017
4
LD22352
FIGURE 12 -
SIGNAL TERMINAL TRANSITION WIRING
Example: Transition wiring in case the start panel of the
chilled / hot water pump and cooling water pump are sepa-
rately equipped.
NOTES
:
• The supply power source is designed as a 3-phase,
4-
wire standard.
• Every unit must be properly grounded. Use an
earth leakage breaker. See
• Connect an interlock if necessary. (The * tells you
the interlock is required.)
a. Operating interlock
* Chilled / hot water pump start signal
• Exhaust gas full open interlock
b. Cooling water pump interlock
* Cooling water pump start signal
c. Normally monitoring interlock
• Seismoscope relay
• abnormal room temperature sensor
d. Emergency failure interlock
• Exhaust gas leak detector
•
For terminal base position & contact specifica
-
tion, see
• Use a shield wire which has a max. extension of
200 m and is more than 0.8 mm
2
thick.
•
Terminals which are not shown in the figures are
already connected in the factory.
Содержание YHAU-CE-JE Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...JOHNSON CONTROLS 22 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 120: ...JOHNSON CONTROLS 120 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 135: ...JOHNSON CONTROLS 135 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 9 THIS PAGE INTENTIONALLY LEFT BLANK...