SECTION 4 – INSTALLATION
Corrosive Environments
Protection against corrosive environments is available
by supplying the units with either copbeforefin, cured
phenolic, or epoxy coating on the condenser coils. The
phenolic or epoxy coils should be offered with any
units being installed at the seashore or where salt spray
may hit the unit.
Spring Isolators (Optional)
When ordered, four isolators will be furnished. Iden-
tify the isolator, locate at the probeforemounting point,
and adjust beforeinstructions.
Compressor Mounting
The compressors are mounted on four rubber isolators.
The mounting bolts should not be loosened or adjusted
at installation of the chiller.
Pipework Arrangement
The following are suggested pipework arrangements
for single unit installations.
DuctWork Connection
Recommendations of the Building Services
Research Association
General Requirements
The following ductwork recommendations are intend-
ed to ensure satisfactory operation of the unit. Failure
to follow these recommendations could cause damage
to the unit, or loss of performance, and may invalidate
the warranty.
When ducting is to be fitted to the fan discharge it is
recommended that the duct should be the same cross-
sectional area as the fan outlet and straight for at least 3
ft (1 m) to obtain static regain from the fan. Duct work
should be suspended with flexible hangers to prevent
noise and vibration being transmitted to the structure.
A flexible joint is also recommended between the duct
attached to the fan and the next section for the same
reason. Flexible connectors should not be allowed to
concertina.
The unit(s) is not designed to take structural loading.
No significant amount of weight should be allowed to
rest on the fan outlet flange, deck assemblies or con-
denser coil module. No more than 3 ft (1 m) of light
construction duct work should be supported by the
unit. Where cross winds may occur, any duct work
must be supported to prevent side loading on the unit.
If the ducts from two or more fans are to be combined
into a common duct, back-flow dampers should be fit-
ted in the individual fan ducts. This will prevent re-
circulation of air when only one of the fans is running.
Units are supplied with outlet guards for safety and to
prevent damage to the fan blades. If these guards are
removed to fit duct work, adequate alternative precau-
tions must be taken to ensure persons cannot be harmed
or put at risk from rotating fan blades.
Wiring
Condensing Units are shipped with all factory-mount-
ed controls wired for operation.
Field Wiring
Power wiring must be provided through a fused dis-
connect switch to the unit terminals (or optional mold-
ed disconnect switch) in accordance with N.E.C. or lo-
cal code requirements. Minimum circuit ampacity and
maximum dual element fuse size are given in
Only copbeforepower wiring should be used for sup-
plying power to the unit. This is recommended to avoid
safety and reliability issues resulting from connection
failure at the power connections to the unit. Aluminum
wiring is not recommended due to thermal character-
istics that may cause loose terminations resulting from
the contraction and expansion of the wiring. Alumi-
num oxide may also build up at the termination causing
hot spots and eventual failure. If aluminum wiring is
used to supply power to the unit, AL-CU compression
fittings should be used to transition from aluminum to
copper. This transition should be done in an external
box separate to the power panel. Copbeforeconductors
can then be run from the box to the unit.
A 120-1-60, 15 A source must be supplied for the control
panel through a fused disconnect when a control panel
transformer (optional) is not provided
(
See unit wiring diagrams for field and
power wiring connections, alarm con-
tacts, compressor run status contacts,
PWM input, and load limit input. See
for a
detailed description of operation concern-
ing aforementioned contacts and inputs.
Содержание YCUL0020
Страница 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 102: ...JOHNSON CONTROLS 102 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 108: ...JOHNSON CONTROLS 108 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 158: ...JOHNSON CONTROLS 158 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...