LIMIT CONTROLS

There is high temperature limit control located on the furnace vestibule
panel near the gas valve. This is an automatic reset control that pro-
vides over-temperature protection due to reduced airflow. This may be
caused by 

1.

dirty filter,

2.

if the indoor fan motor should fail, or

3.

Too many supply or return registers closed or blocked off.

The control module will lockout if the limit trips 5 consecutive times
within a single call for heat. Control will reset and try ignition again after
1 hour.

SECTION X: START-UP AND 

ADJUSTMENTS

The initial start-up of the furnace requires the following additional
procedures:

IMPORTANT: All electrical connections made in the field and in the fac-
tory should be checked for proper tightness.

When the gas supply is initially connected to the furnace, the gas piping
may be full of air. In order to purge this air, it is recommended that the
ground union be loosened until the odor of gas is detected. When gas is
detected, immediately retighten the union and check for leaks. Allow
five minutes for any gas to dissipate before continuing with the start-up
procedure. Be sure proper ventilation is available to dilute and carry
away any vented gas.

TOOLS AND INFORMATION THAT WILL BE 

REQUIRED IN ORDER TO PROPERLY PERFORM THE 

FURNACE STARTUP PROCEDURE.

1.

Call the local gas supplier to obtain heating value of the natural
gas. If you cannot obtain the heating valve of the gas from the gas
supplier, you may use a default value of 1030 BTU/SCF (38.4 MJ/
m³). 

2.

You will need a thermometer or portable digital thermometer to
read the supply and return air temperatures. 

3.

You will need a U-tube manometer or digital equipment that has
the ability to read pressures between 0 – 15” in.w.c (0 - 3.73 kPa)
in order to measure the gas line and the manifold pressures. 

4.

You will need a 3/32” Allen wrench for the pressure port plugs in
the gas valve. 

5.

You will need 2 pieces of 1/8” (0.3 cm) ID flexible tubing that is 12”
(30 cm) in length, 2 – pieces of 1/8” (0.3 cm) tubing that are 4”
(10.0 cm) in length, a 1/8” (0.3 cm) tee and a 1/8” (0.3 cm) adapter
to connect the U-tube manometer or the digital pressure measur-
ing equipment to the gas valve pressure ports.

There is an accessory kit (1PK0601) available from Source 1, which
has the following items:

1 - 12” (30 cm) length x 1/8” (0.3 cm) diameter tubing

2 – pieces of 4” (10 cm) length x 1/8” (0.3 cm) diameter tubing

1 - 5/16” (0.8 cm) tee

1 – 5/16” (0.8 cm) x 1/8” (3.175 mm) reducing coupling

1 – 1/8” (0.3 cm) adapter

There is a accessory kit (1PK0602) available from Source 1, which has
the following items:

12” (30 cm) length x 1/8” (0.3 cm) diameter tubing

2 – pieces of 4” (10 cm) length x 1/8” (0.3 cm) diameter tubing

1 - 5/16” (0.8 cm) tee

1 – 5/16” (0.8 cm) x 1/8” (0.3 cm) reducing coupling

1 – 1/8” (0.3 cm) adapter

1 - Dwyer – Manometer

These items are required in order to properly perform the required star-
tup procedure.

IGNITION SYSTEM SEQUENCE

1.

Turn the gas supply ON at external valve and main gas valve.

2.

Set the thermostat above room temperature to call for heat.

3.

System start-up will occur as follows:
a.

The induced draft blower motor will start and come up to
speed. Shortly after inducer start-up, the hot surface igniter
will glow for about 17 seconds.

b.

After this warm up, the ignition module will energize (open)
the main gas valve.

c.

After flame is established, the supply air blower will start in
about 30 seconds.

IMPORTANT: Burner ignition may not be satisfactory on first startup
due to residual air in the gas line or until gas manifold pressure is
adjusted. The ignition control will make 3 attempts to light before lock-
ing out.

With furnace in operation, check all of the pipe joints, gas valve connec-
tions and manual valve connections for leakage using an approved gas
detector, a non-corrosive leak detection fluid, or other leak detection
methods. Take appropriate steps to stop any leak. If a leak persists,
replace the component.

The furnace and its equipment shutoff valve must be disconnected from
the gas supply piping system during any pressure testing of that system
at test pressures in excess of 1/2 PSI (3.45 kPa).

The furnace must be isolated from the gas supply piping system by
closing the equipment shutoff valve during any pressure testing of the
gas supply piping system.

CALCULATING THE FURNACE INPUT 

(NATURAL GAS)

NOTE: Burner orifices are sized to provide proper input rate using natu-

ral gas with a heating value of 1030 BTU/Ft

3

 (38.4 MJ/m

3

). If the

heating value of your gas is significantly different, it may be nec-
essary to replace the orifices.

NOTE: Front door of burner box must be secured when checking gas

input. 

1.

Turn off all other gas appliances connected to the gas meter.

2.

At the gas meter, measure the time (with a stop watch) it takes to

use 2 cubic ft. (0.0566 m

3

.) of gas.

3.

Calculate the furnace input by using one of the following equa-
tions.

 FIGURE 23:  Pressure Switch Tube Routing

Perform the following procedures only after the condensate trap
has been properly piped to a drain connection using the procedure
in this instruction.

FIRE OR EXPLOSION HAZARD
Failure to follow the safety warnings exactly could result in serious
injury, death or property damage.
Never test for gas leaks with an open flame. Use a commercially
available soap solution made specifically for the detection of leaks
to check all connections. A fire or explosion may result causing
property damage, personal injury or loss of life.

Содержание GY9S

Страница 1: ...6 GAS PIPING 6 ELECTRICAL POWER 8 TWINNING AND STAGING 9 COMBUSTION AIR AND VENT SYSTEM 11 CONDENSATE PIPING 18 SAFETY CONTROLS 18 START UP AND ADJUSTMENTS 19 WIRING DIAGRAM 25 LIST OF FIGURES Dimens...

Страница 2: ...plate and power supply to be sure that the elec trical characteristics match All models use nominal 115 VAC 1 Phase 60 Hertz power supply DO NOT CONNECT THIS APPLI ANCE TO A 50 HZ POWER SUPPLY OR A VO...

Страница 3: ...required for servicing and cleaning 2 Eighteen 18 inches 46 cm at the side where access is required for passage to the front when servicing or for inspection or replacement of flue vent connections In...

Страница 4: ...s properly sized as well 1 The Air Temperature Rise is determined by subtracting the Return Air Temperature Reading from the Supply Air Temperature Read ing 2 The External Static Pressure is determine...

Страница 5: ...igure 1 for unit and plenum dimensions Attic installations must meet all minimum clearances to combustibles and have floor support with required service accessibility The supply air temperature MUST N...

Страница 6: ...the instructions in this section specify the type of gas approved for this furnace only use those approved gases The installation of a drip leg and ground union is required Refer to Figure 4 IMPORTANT...

Страница 7: ...ing a wrench to the body of the gas valve will damage the valve causing improper operation and or the valve to leak TABLE 5 High Altitude Conversion 40 120 MBTUH Models Type Of Gas Orifice at Sea Leve...

Страница 8: ...ernate wiring method is to use a field provided 2 5 08 cm x 4 10 2 cm box and cover on the outside of the furnace Route the furnace leads into the box using a protective bushing where the wires pass t...

Страница 9: ...n two furnaces are installed using the same duct system it is very important that the two furnace cir culating air blowers operate in unison If one blower starts before the second blower the duct syst...

Страница 10: ...will shut off at the same time Continuous Fan On a thermostat call for continuous fan G signal both furnace blowers will come on at the same time in cooling speed and will stay on until the G signal...

Страница 11: ...maximum of 5 elbows in the combustion air piping and a maximum of 5 elbows in the vent piping 4 Three vent terminal elbows two for vent pipe and one for air intake pipe are already accounted for as v...

Страница 12: ...rom the furnace to the out side termination B Ventilated combustion air systems from the furnace to the attic or crawl space termination 6 Disassemble the combustion air and vent piping apply cement p...

Страница 13: ...0 kW 36 inches 91 cm for models 100 000 BTUH 30 kW Two pipe direct vent applications 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW Single pipe applications 4...

Страница 14: ...ombustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 14 or 15 VENTING MULTIPLE UNITS Multiple units can be installed...

Страница 15: ...ll bring air in from the outdoors to the furnace combustion air intake collar on the burner box The second pipe Shown in Figure 19 is the furnace vent pipe The combustion air intake pipe should be loc...

Страница 16: ...e louver is in the fully open position This type of installation requires that the supply air to the appli ance s be of a sufficient amount to support all of the appliance s in the area Operation of a...

Страница 17: ...sage Follow all notes procedures and required materials in the SEALED COMBUS TION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a ventilated a...

Страница 18: ...p pump must be approved for use with acidic condensate CONDENSATE DRAIN TRAP AND DRAIN FREEZE PROTECTION Special precautions MUST be made if installing furnace in an area which may drop below freezing...

Страница 19: ...th x 1 8 0 3 cm diameter tubing 2 pieces of 4 10 cm length x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 0 3 cm reducing coupling 1 1 8 0 3 cm adapter 1 Dwyer Manometer These item...

Страница 20: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Страница 21: ...l reference atmo spheric pressure Refer to Figure 26 for connection details IMPORTANT The cap for the pressure regulator must be removed entirely to gain access to the adjustment screw Loosening or ti...

Страница 22: ...ning the jumper on two of the four pins as shown in Figure 27 The blower speed connections shown in Figure 27 are typical How ever these connections may vary from model to model and may be changed as...

Страница 23: ...35 1175 33 1105 31 1045 30 990 28 905 25 890 25 790 22 80 1600 C 100 1600 C HIGH 1960 56 1955 55 1925 55 1890 54 1830 52 1765 50 1695 48 1615 46 1600 45 1485 42 M HI 1565 44 1560 44 1560 44 1575 45 15...

Страница 24: ...that total system static is 0 58 w c To determine the system airflow complete the follow ing steps Obtain the airflow values at 0 50 w c 125 Pa 0 60 w c 150 Pa ESP Airflow 0 50 2285 CFM 64 70 m3 min A...

Страница 25: ...105561 UIM B 0605 Unitary Products Group 25 SECTION XI WIRING DIAGRAM FIGURE 27 Wiring Diagram...

Страница 26: ...105561 UIM B 0605 26 Unitary Products Group NOTES...

Страница 27: ...105561 UIM B 0605 Unitary Products Group 27 NOTES...

Страница 28: ...o change without notice Printed in U S A 105561 UIM B 0605 Copyright by York International Corp 2005 All rights reserved Supersedes 105561 UIM A 0205 Unitary 5005 Norman Product York OK Group Drive 73...

Отзывы: