![York International ZK Series Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/york-international/zk-series/zk-series_installation-manual_913856011.webp)
5121817-TIM-A-0515
Johnson Controls Unitary Products
11
Figure 9: ZKT03 Thru T05 Unit Side Duct Openings
Figure 10: ZKT03 Thru T05 Roof Curb
Table 5:
ZKT03 Thru T05 Utilities Entry
Hole
Opening Size (Dia.)
Used For
A
7/8” KO
1
1. Opening in the bottom to the unit can be located by the slice in the
insulation.
Control Wiring
2
2. Do not remove the 2” knockout ring.
Side
Bottom
B
2” KO
1
Power Wiring
Side
Bottom
C
1-5/8” KO
Gas Piping (Front)
D
1-1/2” KO
Gas Piping (Bottom)