![YOKOGAWA ys100 series Скачать руководство пользователя страница 16](http://html2.mh-extra.com/html/yokogawa/ys100-series/ys100-series_replacement-manual_3499035016.webp)
TI 01B08A02-07EN
16
2014.06.13
Switch from TEST2 mode to RUN mode.
4.11 Start in RUN mode after debugging
Be sure to review the data that was
downloaded from the YS100 to the YS1000
and converted, and check operation.
If the program to be converted has multiple differing
control commands (BSC1, BSC2, CSC, SSC), the
control function of the last step of the program is
selected for the control function selection.
5 Precautions
Содержание ys100 series
Страница 18: ...Blank Page...