Items to Confirm before Start of Operation
Before you start operation, inspect and confirm the following items:
(1) Draw out the internal unit from the rack case, and make sure that the specified fuses are
properly mounted in the fuse holders at the rear of the internal unit.
(2) When inserting the internal unit into the rack case, firmly connect the multi-pin
connectors for connecting the internal unit and the case.
(3) Make sure that power plugs are properly connected to the power outlet.
(4) Make sure that external wiring to the terminal block is properly connected.
Refer to Section 7.1, “Action in Fault Condition” for how to detect device error by
alarm output.
Chapter 5 Setting
Содержание YewSeries 80
Страница 2: ......
Страница 10: ...Blank...
Страница 15: ...2 5 IM 01B04K02 02E General 1 2 3 App 1 2 3 5 6 7 8 4 2 4 Accessories Alarm Label 1 sheet...
Страница 16: ...Blank...
Страница 42: ...Blank...
Страница 54: ...Blank...
Страница 58: ...Blank...