
<8. MAINTENANCE>
8-11
IM 12B01B30-02EN
1st Edition : Mar. 08, 2023-00
CAUTION
After turning on the power, warm up the instrument for at least 30 minutes before starting the run.
Arrange the following fuses.
Table 8.5
Fuse
Part Number
Product name
Remark
A1633EF
Fuse
Fuse for TB830D x 1
A1624EF
Fuse
1 fuse for relay box (*)
(*)
Two are required for the relay box.
8.11 Replacement of the Silicone Tube
(1) Set converter maintenance mode to On and unclamp the silicone tube.
(2) Open the pinch valve (SV4: solenoid valve).
(3) Remove the silicone tube and thread the new silicone tube through the hole in the pinch
valve (SV4).
(4) Pass the clamp through the silicone tube and insert the upper side into the lower side of the
head tank (it will be easier to insert if it is wet).
(5) Make sure that the drain pipe is visible from the top of the head tank.
(6) Close the clamp.
(7) Place the end of the tube into the drain pipe.
Table 8.6
Silicone tube
Part No.
Product name
Note
K9411JM
Silicone tube
for SV4
CAUTION
•
The pinch valves become hot when energized. The pinch valves are setup to Off
automatically after 10 minutes or more.
•
The valve may not open if no tube is inserted or if the tube is crushed and stuck. If this
happens, assist by hand.
Содержание TB830D
Страница 7: ...Blank Page ...
Страница 29: ...Blank Page ...
Страница 35: ...Blank Page ...
Страница 51: ...Blank Page ...
Страница 75: ...Blank Page ...
Страница 85: ...Blank Page ...