<8. Maintenance>
8-4
IM 12F4A1-01E
Metering pump mounting screws (4 screws)
Pump mounting plate
Pump main body
Transparent plate mounting screws
Piston
Transparent plate
Retainer mounting screw
“Bellofram”
Retainer
Ring
O-ring
Valve assembly
F8.2.ai
Figure 8.2
Metering Pump Construction
8.7.1
“Bellofram” Replacement
Perform “Bellofram” replacement work using the following procedure:
(1) Press [PUMP] key to stop metering pump operation. Take measures to prevent reagent
from flowing out of the reagent tank.
(2) Remove the transparent plate of the metering pump.
Loosen four screws located on the front face.
(3) Remove the ring which forces the “Bellofram” flange down.
(4) Remove the retainer fixed to the piston with screw.
(5) Remove the “Bellofram” which has been used and mount a new “Bellofram”.
For mounting, first press the “Bellofram” flange using the ring. Fold the “Bellofram” so as to
cover the piston using the attached jig (see Figure 8.3).
(1)
(2)
“Bellofram”
Ring
Pump main body
Piston
“Bellofram” mounting jig
F8.3.ai
Figure 8.3
“Bellofram” Mounting Procedure
(6) Reassemble the disassembled parts.
14th Edition : Jul. 15, 2020
Содержание RC400G
Страница 5: ...Blank Page ...
Страница 9: ...Blank Page ...
Страница 25: ...Blank Page ...
Страница 41: ...Blank Page ...
Страница 95: ...Blank Page ...
Страница 139: ......