![YOKOGAWA F3LP32-0N Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/yokogawa/f3lp32-0n/f3lp32-0n_user-manual_910937037.webp)
3-1
IM 34M06H43-02E 2nd Edition : Sep.30, 2019-00
3. Setup and Connection of Modules
3.1 Startup Procedures
Configuration Setup of
CPU Module
FA Link Configuration
(
See Section 3.3
)
(
See Section 3.4
)
(
See Section 3.5
)
You should refer to wiring precautions.
(
See Section 3.6
)
Switch on the power supply of all the stations connected.
(
See Section 3.7
)
Checking can be done using the WideField3.
(
See Section 3.8
)
Setup the capacity of link devices using the WideField3.
(
See Section 3.9
)
Assign link devices to stations using the WideField3.
(
See Section 3.10
)
Checking Communication
Status
Applying the P ower
Wiring
Attaching and Detaching
Modules
Setting Parameters
Setting Station Numbers
Figure 3.1.1 Startup Procedures
Содержание F3LP32-0N
Страница 2: ...Blank Page...
Страница 14: ...Blank Page...
Страница 18: ...Blank Page...
Страница 24: ...Blank Page...
Страница 36: ...Blank Page...
Страница 82: ...Blank Page...
Страница 92: ...Blank Page...
Страница 100: ...Blank Page...
Страница 102: ...Blank Page...
Страница 104: ...Blank Page...