![YOKOGAWA av550g Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/yokogawa/av550g/av550g_user-manual_911433063.webp)
< 4. Piping >
4-6
IM 11M12D01-01E
4.1.6 Piping for Indication check
To perform an indication check using the third check gas, the piping to allow the third gas to flow
into the calibration gas line is required for the ZA8F Flow Setting Unit in addition to the system
configuration shown in Figure 4.1.
Connect the piping from the third check gas cylinder through a pressure reducing valve and a stop
valve, along with the span gas line, to the zero gas inlet of the ZA8F Flow Setting Unit. To perform an
indication check, open the stop valve on the line from the third check gas cylinder, while open the stop
valve on the span gas line to perform span calibration.
Span gas cylinder
(Instrument air)
Zero gas cylinder
Air Set
Pressure reducing valve
Instrument air
Stop valve
Flowmeter
Flowmeter
Needle valve
Needle valve
Reference
gas line
Calibration
gas line
ZA8F flow setting unit
Third check gas cylinder
Reference
gas line
Calibration
gas line
ZA8F flow setting unit
F4-8E.ai
Figure 4.8 Piping to ZA8F Flow Setting Unit for Indication Check Using 3rd Check Gas
Содержание av550g
Страница 17: ...Blank Page ...
Страница 45: ...Blank Page ...
Страница 71: ...Blank Page ...
Страница 203: ......
Страница 205: ......
Страница 207: ......
Страница 209: ......
Страница 211: ......
Страница 213: ...Blank Page ...