12-17
IM AQ1300-01EN
E-OAM T
est
3
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
App
Index
12.8 Starting and Stopping an LB Test
Procedure
After entering the settings described in sections 12.1 to 12.5 and 12.7, you can execute an E-OAM LB
test.
Starting an LB Test
1.
Press
START
. The following screen appears, and an LB test starts.
Network status ►section 2.1
Title bar ►section 2.1
Measurement status ►section 2.1
Test information
Summary
Test results
Statistics counter and
error detection history
►
section 2.1
Execute an LT or Multicast LB.
►
section 12.10
File
Save the measured results of LB tests. ► section 13.2
Displays detailed statistics
Stopping an LB Test
When the transmission end conditions are met, transmission stops automatically.
Press
STOP
to display the following screen and stop measurement.
Indication that measurement has finished
Measurement duration
Remaining Tx time