12.2 Sharing Projects
The three different methods for sharing project information are listed below.
Procedure
Sending a Project
WARNING
• While the AQ1200 is producing light, do not remove the optical fiber cable, because light is
emitted from the light source port. Visual impairment may occur if the light enters the eye.
• Close the covers of any light source ports that do not have optical fiber cables connected
to them. On models with two or more light source ports, visual impairment may occur if light
that is mistakenly emitted from the wrong port enters the eye.
Connect one end of the communication fiber that you specified to the master’s light source port,
and connect the other end to the slave’s optical power measurement port. Then transfer the project
information.
4.
Press the
Project Transmission START
soft key to generate the optical signal
used to transmit the project information.
3.
Press the
Receive Project from Master
soft key.
On the menu, “Receive Project from Master”
changes to “Abort.”
After reception finishes, “Abort” changes back
to “Receive Project from Master” and the
following screen appears.
1.
Using the
rotary knob
and
ENTER
, select
Multi-Core
Loss Test
.
2.
Press the
Master/Slave
soft key to select
Master
.
3.
Create a new project (see section 12.1), or load a
project file (see the next page). The following menu
appears.
1.
Using the
rotary knob
and
ENTER
, select
Multi-Core
Loss Tes
t.
2.
Press the
Master/Slave
soft key to select
Slave
. The
following menu appears.
Slave
Master
Loss Test Screen
Loss Test Screen
On the menu, “Project Transmission START”
changes to “Project Transmission STOP.”
After transmission finishes, “Project
Transmission STOP” changes back to “Project
Transmission START” and the following screen
appears.
Optical Power Adjustment
Adjust as necessary (see section 12.4).
Now the master and slave share the same project information.