YMGI
•
Your Modern Green Idea
15
Preparation before Installation
The picture is only used for reference and the actual product prevails. Unit: mm (in.).
Standard Parts
Please use the following standard parts supplied by YMGI.
Number
Name
Picture
Remarks
1
Owner's Manual
2
Wiring (match with resistance)
Must be connected to the last
IDU of communication
connection
3
Mark (Master )
Attach on the wired controller
of master IDU or on the front
panel
Installation Site
1. Install the unit in a location where the floor is adequate and can withstand the weight of the unit, and ensure the
unit will not shake or fall off.
2. Never expose the unit under direct sunshine and rainfall. Install the unit at a place where it is protected against
dust, typhoons and earthquakes.
3. Try to keep the unit away from combustible, flammable, and corrosive gas or exhaust gas.
4. Leave some space for heat exchanging and servicing so as to guarantee unit normal operation.
5. Keep the indoor and outdoor units close to each other as much as possible so as to decrease the pipe length
and bends.
6. Never allow children to approach to the unit and take measures to prevent children touching the unit.
Содержание VRFO-72VP-U2C(55)5
Страница 10: ...YMGI Your Modern Green Idea 10...
Страница 23: ...YMGI Your Modern Green Idea 23 Connection Pipes Fig 16...
Страница 75: ...YMGI Your Modern Green Idea 75...