2
W70B Package Contents
Power Adapter
Base Stand
W70B Base Station
Ethernet Cable
Assembling the DECT Phone
1. Connect the base station power and the network using method a or
method b.
a. AC Power Option
b. PoE (Power over Ethernet) Option
IEEE 802.3af compliant
PoE Hub/Switch
Note
:
•
If you choose method a, use Yealink supplied power adapter (5V/0.6A). A third-party power adapter may
damage the base station.
•
If you choose method b, you do not need to connect the power adapter. Make sure the hub/switch is PoE-
compliant.
Содержание W73P
Страница 2: ......
Страница 3: ...Table of Contents English 1 Deutsch 14...
Страница 4: ......
Страница 31: ......