![YASKAWA Solectria PVI 25TL-208 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/yaskawa/solectria-pvi-25tl-208/solectria-pvi-25tl-208_installation-and-operation-manual_3491610036.webp)
Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
DOCR-071030-A (10/7/2022)
Page 36 of 131
Figure 3-12 Main Enclosure Cover Plate
Remove screws securing the bulkhead cover at the top of the wiring box.
Figure 3-13 Wiring Bulkhead Cover
INFO
✔
The covers shown above do not have waterproof function. THEY ARE NOT WATER TIGHT.
Save the bulkhead connector cover and screws and attach the cover to the left side of the wiring box after the
wiring box is attached to the inverter enclosure. Covers may be required in the future if an inverter or wiring box
is to be removed during servicing.
Tool required: No.2 Phillips head screwdriver