Sigma II User’s Manual
Chapter 4: Trial Operation
4 - 2
4.1 Two-Step Trial Operation
Make sure that all wiring is completed prior to starting trial operation.
Perform the trial operation in the order given below (step 1 and 2) for your safety. See
4.1.1 Step 1: Trial Operation for Servomotor without Load
and
See
4.1.2 Step 2: Trial
Operation with the Servomotor Connected to a Load
for more details on the trial opera-
tion.
Make sure the servomotor is wired properly and then turn the
shaft prior to connecting the servomotor to the equipment.
Check wiring.
C
N
3
C
N
1
L1C
L2C
B1
B2
U
V
W
L1
L2
1
2
C
N
2
SGDM-
MODE/SET
DATA/
CHARGE POWER
SERVOPACK
200V
YASKAWA
Do not connect to the equipment.
Adjust the servomotor according to equipment characteristics.
Connect the servomotor to the equipment, and perform the trial
operation.
SGDH
servo
amplifier
Connect to the equipment.
Adjust speed by autotuning.
Step 1: Trial Operation for Servomotor without Load
Step 2: Trial Operation with the Equipment and Servomotor Connected
SGM H
servomotor
Содержание SGMAH
Страница 1: ...Sigma II Series Servo System User s Manual...
Страница 2: ......
Страница 4: ...ii This page intentionally left blank...
Страница 6: ...iv This page intentionally left blank...
Страница 10: ...Sigma II User s Manual Table of Contents Preface viii Notes...
Страница 17: ...Sigma II User s Manual Table of Contents Preface xv C 6 Torque Control Mode C 9...
Страница 18: ...Sigma II User s Manual Table of Contents Preface xvi...
Страница 38: ...Sigma II User s Manual Chapter 2 Installation 2 10 NOTES...
Страница 472: ...Sigma II User s Manual Appendix C Examples of Standard Connections C 10 Notes...
Страница 487: ......