Step 2.
Place two 44” 2x4 joists in the joist hangers and fasten them with
1 3/4” washer head screws.
Step 3.
Place four 42” 4x4 posts in place.
These are pre-drilled for the threaded rods, notice how the holes
are offset and need to align with the holes in the 2x6’s.
Step 4.
Place two 67” 2x6’s on the outside of the 4x4 posts and align the
holes.
Step 1.
Begin the assembly by locating the two 32” 2x6’s with the joist
hangers attached.
Содержание Pluto
Страница 1: ...Pluto Assembly Manual...