background image

Hardware

7

6

5

4

3

2

1

3/8 x 6 7/8”

Threaded Rod

3/8 x 6 1/8”

Threaded Rod

3/8 x 4” Hex Head Lag

1 1/2” Wafer Head Lag

1 3/4” Washer Head Screw

1 1/2” Poly Screw

3/8” Acorn Nut

3/8” Washer

3/8 x 4 7/8”

Threaded Rod

3/8 x 2 3/4”

Threaded Rod

5/16 x 3 1/2” Hex Head Lag

Содержание Pluto

Страница 1: ...Pluto Assembly Manual...

Страница 2: ...low in mainte nance but keeps the fun factor high The Pluto Vinyl Playset will enhance the appearance of your backyard while also making it a one stop shop for having fun and making memories Patiova...

Страница 3: ...6 7 8 Threaded Rod 3 8 x 6 1 8 Threaded Rod 3 8 x 4 Hex Head Lag 1 1 2 Wafer Head Lag 1 3 4 Washer Head Screw 1 1 2 Poly Screw 3 8 Acorn Nut 3 8 Washer 3 8 x 4 7 8 Threaded Rod 3 8 x 2 3 4 Threaded R...

Страница 4: ...our 42 4x4 posts in place These are pre drilled for the threaded rods notice how the holes are offset and need to align with the holes in the 2x6 s Step 4 Place two 67 2x6 s on the outside of the 4x4...

Страница 5: ...or each end Step 7 Fasten the floorboards using 1 1 2 poly screws The floorboards get two screws at each end and one for each joist Step 8 Place two 32 2x6 s on the 4x4 posts and fasten them with 6 7...

Страница 6: ...two bottom leg sections and a ladder section Step 12 Place the bottom leg pieces on the legs and fasten them with 3 1 2 hex head lags Use two lags into each leg and one lag through the side brace Ste...

Страница 7: ...tower up and place one of the legs under it Step 15 Fasten the leg with 3 1 2 hex head lags in the pre drilled holes Step 16 Repeat steps 14 15 to finish the other leg Step 13 Lay the legs in positio...

Страница 8: ...ith 1 3 4 washer head screws Step 19 Place the 2x4 s on the 2x6 railings with the brackets facing in Center them and fasten them with the same washer head screws Step 20 Place the 37 1 2 2x4 on top an...

Страница 9: ...bly with the 2x6 swing beam One side is pre drilled for the swing brackets place the beam with the holes facing up Step 21 Unroll the tarp roof and place it in position over the center 2x4 Fasten one...

Страница 10: ...threaded rods Step 4 Locate the beam strap bracket and place it on the other end of the beam Fasten it with 4 7 8 threaded rods Step 5 Place the 4x4 end post in the bracket and fasten it with the sam...

Страница 11: ...ing two 2 3 4 threaded rods Step 6 Place the corner bracket on the inside of the post and fasten it with 1 3 4 washer head screws Step 7 Lift the swing beam up into place on the tower Note The 4x4 end...

Страница 12: ...ded rods Step 10 Place the 93 2x4 in position on the ground then drill a 7 16 hole through the 4x4 post Fasten the 2x4 with a 6 1 2 threaded rod Step 12 Fasten the top of the braces with 4 hex head la...

Страница 13: ...into the 2x6 and not just the floorboards Wonder Wave Slide Place the slide in the empty spot on the tower Playset Stakes The playset comes with a bundle of stakes and hardware Playset Stakes Drive t...

Отзывы: