background image

4

Cydonia Vinyl Playset

 Assembly Manual

Unpack and identify parts. 

Identify and then p

lace two 2x6x

 73 1/2" 

and two 

2x6x

56"

 on a smooth, flat surface to begin.

 Make sure 

floor joist hangers are turned in. Also notice shims at 

four corners. 

Threa

d 6 3/8" 

bolts into T-nuts on four corners. 

Fasten 

four  4x4x54". 

Pre-drilled  hole configuration  is 

very  important  on  all  4x4's.  Hand  tighten  acorn 

nuts  at  this  point.  Be  sure  to  always  place  washer 

between vinyl and acorn nut. 

Step 1:

Step 4:

Step 3:

Step 2:

Содержание Cydonia Vinyl Playset

Страница 1: ...Assembly Manual Cydonia Vinyl Playset...

Страница 2: ...he satisfaction and enjoyment of this hideout is only a few minutes away Have fun You have purchased a product that consists of bulky pieces With your purchase you assume full responsibility to have t...

Страница 3: ...Parts List...

Страница 4: ...ce to begin Make sure floor joist hangers are turned in Also notice shims at four corners Thread 6 3 8 bolts into T nuts on four corners Fasten four 4x4x54 Pre drilled hole configuration is very impor...

Страница 5: ...7 8 bolts Tighten nuts at this point Over tightening acorn nuts can cause the head to pop off Install three floor joists Fasten joists to hangers using 1 3 4 washer head screws Step 5 Step 8 Step 7 S...

Страница 6: ...ews Measure to ensure the floor frame is square before continuing Using 6 7 8 bolts being fastening 2x6 s to tower 4x4 Thread acorn nut onto rod as far as you can then back off several turns Be sure t...

Страница 7: ...tening slats Use 1 3 4 screws to fasten slats Assembly instructions for the components can be found on pages 23 26 Prepare to assemble legs by identifying two 2x6x 81 1 2 with long point on one end Al...

Страница 8: ...1 2 stainless steel lag screw Repeat steps 15 17 for second leg Prepare to fasten leg to tower Start four 4 3 8 bolts in holes before lifting platform into position Step 17 Step 20 Step 19 Step 18 Cy...

Страница 9: ...and tower assembly should join together like this 4 3 8 bolts that were started in previous step can be fastened into the t nuts Also on opposite side Fasten long point to 4x4 using 4 lag You may nee...

Страница 10: ...et rock wall and step ladder panels These are interchangeable at all locations on the legs Decide where you want these positioned prior to fastening Typically there is one empty space where the slide...

Страница 11: ...uld be put in at this location on both the rockwall and cargo net Fasten about halfway up the leg as well Fasten a 3 1 2 stainless steel lag screw at these locations as well Fasten two lags at this lo...

Страница 12: ...31 Step 30 Install the step ladder Install 2x6 on leg at the slide location This is to provide reinforcement to the structure Three lags should be used to fasten this The next step is to install the...

Страница 13: ...t two washers and lock nut at four corner s Your completed plastic roof should look like this Step 2 Step 4 Step 3 Pyramid Roof Assembly Instructions Step 1 Fasten flat roof bracket to top of post usi...

Страница 14: ...stall the tire swing Attach tire swing swivel under the deck using 3 lags Then attach the tire swing to the swivel Attach slide using 1 3 4 washer head screws The next step is to install the swing fra...

Страница 15: ...beam using lags provided in bearing packs Step 2 Step 1 Swing Frame Assembly If you purchased a plastic glider your next step is to install the glider bracket This bracket needs to be fastened to the...

Страница 16: ...acorn nut and the metal bracket Tighten nuts Step 6 Step 5 Swing Beam Assembly With swing beam in same position attach beam strap to swing beam using two 4 7 8 bolts provided Only finger tighten at th...

Страница 17: ...t may not appear exactly as pictured Swing Beam Assembly Step 9 Step 10 Fasten corner brace to swing beam and end post Be sure end post is plumb Attach using six 1 3 4 washer head screws Push bracket...

Страница 18: ...rns Be sure to place washer between acorn nut and vinyl Step 13 Step 16 Step 15 Step 14 Identify end post braces Fasten the short angle to the ground runner that was installed on previous step Use 4 1...

Страница 19: ...19 Step 17 Swing Beam Assembly Your completed swing frame should appear like this The next step is to install the climbing set Instructions for the climbing set assembly can be found on pages 20 22...

Страница 20: ...To begin identify the main components one top ladder one ground runner 2x4 and two brace 2x4 s and one end ladder On opposite end fasten end ladder to top ladder using four 4 1 8 bolts Tighten using a...

Страница 21: ...inst inside of 2x6 Pre drill 7 16 hole through hole on inside flange and through 2x6 Step 6 Climbing Set Assembly Fasten ground runner 2x4 to end ladder using two 6 1 8 bolts Tighten immediately Step...

Страница 22: ...ten long angle to end ladder using 4 lag Pre drilling is recommended Your climbing ladder assembly is now complete Step 10 Step 9 Climbing Set Assembly 22 The next step is to install any other compone...

Страница 23: ...ur 1 3 4 washer head screws 6WHS 3 6WHS 2 Fasten opposite end to tower at any desired location using four 1 3 4 washer head screws Fasten 2x6x18 1 2 to poly slats on railing using four 1 3 4 washer he...

Страница 24: ...nstructions Framing for peek a boo panel tornado tube tunnel express and sidewinder slides 6WHS 1 6WHS 2 Fasten with 1 3 4 screws at desired location according to the components you purchased with you...

Страница 25: ...le slide and fasten slide to tower using hardware and instructions provided with slide Step 3 Then place 2x4 s at desired location on tower and fasten using 1 3 4 screws Space between vertical 2x4 s s...

Страница 26: ...will take two able bodied men 6WHS 3 6WHS 2 One person hold slide steady while other person goes up into the tower to fasten slide Fasten the slide to the upper deck using the lags provided in the har...

Отзывы: