40 | RMB/ENERGIE GmbH
appendix
Operation manual CHP 5.0 - 30.0 | Status 01.2020
12.2.5 Heating system variant 5 –
2 CHP, 2 buffer tanks, peak load boiler connected to buffer tank via hydraulic separator
T3
T4
T3
T4
T1
T2
T1
T2
SLK
SLK
7
8
9
10
M
11
12
22
23
21
24
20
25
19
18
17
15 16
13
28
27
29
30
14
CHP
T
T
26
1
2
3
4
5
6
31
32
33
34
35
CHP
T5
2
5
1
Circulating pump
2
Shut-off
3
Combination filter
4
Circulating pump
5
Shut-off
6
Combination filter
7
Drain
8
Safety valve
9
Cap valve
10 Expansion tank
11 Buffer tank
12 Buffer tank
13 Drinking water tank
14 Temperature sensor
15 Shut-off
16 Circulating pump
17 Shut-off
18 Non-return valve
19 Ventilation
20 Shut-off
21 3-way mixer
22 Shut-off
23 Non-return valve
24 Circulating pump
25 Heating circuit consumers
26 Temperature sensor
27 Hydr. switches
28 Ventilation
29 Circulating pump
30 Non-return valve
31 Non-return valve
32 Shut-off
33 Non-return valve
34 Shut-off
35 Ventilation
–––
Supply
••• Return