RMB/ENERGIE GmbH | 27
assembly
Operation manual CHP 5.0 - 30.0 | Status 01.2020
5.4.4 Starting the test run
To ensure the system is bled fully, perform the following
in the correct order.
A
Open the valves on the generation unit as follows:
1. Buffer water return line
2. Buffer water supply line
3. Gas
A
Ensure that the heating system is ready for the test
run.
A
Open the valves on the buffer tank.
A
Unlock the emergency stop switch.
A
Switch on the master switch.
A
Start the test run via the operating display.
Observe the associated instructions for operation.
“RMB/Control” operating manual.
5.4.5 Checking the system
A
Check the gas and exhaust gas sealing within the
generator unit.
A
Check the gas and exhaust gas sealing of the
system.
A
Bleed the cooling system.
A
Remove any leaking cooling medium.
A
Check the pressure of the cooling system.
A
If necessary, refill with cooling medium.
A
Vent the heating circuit system at the heat
exchanger.
If necessary, the venting procedure should be carried
out several times.