B95W
Safety
03_Sicherheit_en.fm - V 0.1 - 1.8.17
29 / 306
3
46
Apprentice staff:
•
Protective clothing
•
Safety footwear
3.5
Workspace safety
3.5.1
General work zone regulations and safe work practices
Read the operating instructions thoroughly and follow the notes on safe
operation before putting the machine into operation.
In addition to the operating instructions, also observe the national legal and
miscellaneous regulations applicable at the deployment location of the machine:
•
Safety at work
•
Accident prevention
•
Health protection
•
Environmental protection
•
Traffic on public roads
Such duties may also apply in respect of, e.g., handling hazardous materials or
the wearing of personal protective equipment.
Furthermore, safety laws governing work in particular locations (tunnels, adits,
quarries, pontoons, contaminated areas, etc.) must likewise be observed.
The plant operator and the machine driver are responsible for ensuring that the
safety regulations are upheld. The operator must always familiarize himself with
the local regulations.
3.5.2
Switching off the machine and securing it against
restarting
Ensure all the following safety instructions are read prior to using or performing
maintenance on the machine, to avoid personal injury.
Before breaks and the end of work, park the machine on a solid and level base.
The machine is only to be parked in places where it does not obstruct,
e.g., public or construction site traffic.
Lower the loading equipment to the ground by supporting it on the dipper.
Lower the dozer blade.
Shut down the engine and pull out the ignition key.
Close the vandalism guard (canopy). (option)
Put the exit barrier (left-hand armrest) in the upright position.
Lock the windows and the doors.
Содержание B95W
Страница 2: ......
Страница 8: ...B95W Table of contents 6 306 1 01_Inhaltsverzeichnis_enIVZ fm V1 0 1 8 17 10 ...
Страница 52: ...B95W Description 50 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Страница 58: ...B95W Description 56 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Страница 206: ...B95W Maintenance 204 306 6 06_Wartung und Pflege_en fm V1 0 1 8 17 20 ...
Страница 208: ...B95W Operation 206 306 7 07_Bedienung_en fm V1 0 1 8 17 26 ...
Страница 238: ...B95W Operation 236 306 7 07_Bedienung_en fm V1 0 1 8 17 26 Optional SAE control system Fig 7 14 Lever control 3 5 4 1 2 ...
Страница 272: ...B95W Transport 270 306 8 08_Transport_en fm V1 0 1 8 17 27 ...
Страница 302: ...B95W Troubleshooting 300 306 10 10_Fehlerbeseitigung_en fm V1 0 1 8 17 30 ...
Страница 309: ......
Страница 310: ...http www yanmar eu MOBILE EXCAVATOR ...