2. Before operating the unit
Installation procedures
・
precautions
(1)
Select an installation site.
・
Make sure that all of four legs are securely on a flat surface.
・
Two legs on the unit front are adjustable. Adjust them so that the installed unit will not be
unstable. Turning the adjuster clockwise raises it and turning it anti-clockwise lowers it.
(2) ・
Placement of the drain pan.
Be sure to place a drain pan to receive
water generated during the drying
process.
(3)
Install shelf boards.
・
Install shelf pegs at heights you want on the right and left shelf posts in the internal bath of
the main body.
・
Completely push shelf boards by sliding to the end.
*Take care to put each shelf board on correct pairs of right and left shelf pegs.
・
Make sure that shelf boards will not fall nor rattle.
・
Withstand load of each shelf board is 15kg in even loading. When putting instruments,
arrange them as dispersed as possible.
Shelf board
Samples
15kg
・
Put instruments with appropriate spaces between them. Too many instruments may prevent
proper temperature control. To assure proper temperature control, put instruments with a
space at least 30% of the shelf board area.
Assure at least 30% of space.