2 - 19
SPEC
Shift shaft cover
Bolt
M6
6
12
1.2
8.7
Oil baffle plate
Bolt
M6
5
10
1.0
7.2
LT
Timing mark accessing screw
–
M8
1
15
1.5
11
Starter clutch
Bolt
M6
3
12
1.2
8.7
LT
Clutch boss
Nut
M20
1
70
7.0
50
Use a lock
washer.
Clutch spring
Bolt
M6
6
8
0.8
5.8
Drive sprocket
Nut
M18
1
70
7.0
50
Use a lock
washer.
Main axle bearing housing
Screw
M6
3
12
1.2
8.7
LT
Shift drum retainer
Bolt
M6
2
10
1.0
7.2
LT
Shift shaft spring stopper
Bolt
M8
1
22
2.2
16
LT
Shift rod locknut
Nut
M6
2
7
0.7
5.1
Shift arm
Bolt
M6
1
10
1.0
7.2
Stator coil
Bolt
M6
3
10
1.0
7.2
LT
Neutral switch
–
M10
1
20
2.0
14
Pickup coil
Screw
M5
2
4
0.4
2.9
LT
Thermo switch
–
M16
1
23
2.3
17
Camshaft sensor
Bolt
M6
1
10
1.0
7.2
LT
Speed sensor
Bolt
M6
1
10
1.0
7.2
LT
Coolant temperature sensor
–
M12
1
18
1.8
13
Intake air temperature sensor
–
M12
1
18
1.8
13
Intake air pressure sensor
Screw
M5
2
5
0.5
3.6
LT
Atmospheric pressure sensor
Screw
M5
2
5
0.5
3.6
LT
Air funnel
Bolt
M6
8
10
1.0
7.2
LT
Throttle body assembly
Bolt
M6
16
10
1.0
7.2
Injector 2 cover
Bolt
M5
8
8
0.8
5.8
LT
Fuel distributor
Bolt
M6
6
10
1.0
7.2
LT
Injector fuel pipe 1,3 and 4
Union bolt
M12
3
30
3.0
22
Injector fuel pipe 2
–
M12
1
30
3.0
22
Fuel hose joint pipe
Bolt
M5
1
6
0.6
4.3
LT
Pressure sensor bracket
Bolt
M5
2
8
0.8
5.8
LT
Item
Fastener Thread size Q’ty
Tightening torque
Remarks
Nm m·kgf ft·lb
TIGHTENING TORQUES
Содержание YZF-R7
Страница 1: ...5FL 28199 E0 YZF R7 OWNER S SERVICE MANUAL ...
Страница 8: ......
Страница 58: ...2 20 SPEC Crankcase tightening sequence TIGHTENING TORQUES ...
Страница 72: ...3 3 CHK ADJ ...
Страница 127: ...3 58 CHK ADJ CHECKING AND CHARGING THE BATTERY Charging method using a variable voltage charger ...
Страница 128: ...3 59 CHK ADJ CHECKING AND CHARGING THE BATTERY Charging method using a constant voltage charger ...
Страница 363: ...8 27 ELEC ...
Страница 380: ......
Страница 381: ...PRINTED IN JAPAN 98 12 0 5 1 CR PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...