CRANKSHAFT AND BALANCER SHAFT
5-95
f. Tighten the bolts to specification in the
tightening sequence cast on the crank-
case. Refer to “CRANKCASE” on page
5-71.
g. Remove the lower crankcase and the bal-
ancer shaft journal lower bearings.
h. Measure the compressed Plastigauge®
width “a” on each balancer shaft journal. If
the balancer shaft-journal-to-balancer
shaft-journal-bearing clearance is out of
specification, select replacement balancer
shaft journal bearings.
4. Select:
• Balancer shaft journal bearing (J
1
–J
4
)
TIP
• The numbers “A” stamped into the balancer
shaft web and the numbers “B” stamped into
the lower crankcase are used to determine the
replacement balancer shaft journal bearing siz-
es.
• “J
1
”–“J
4
” refer to the bearings shown in the bal-
ancer shaft and lower crankcase illustration.
For example, if the crankcase “J
1
” and bal-
ancer shaft web “J
1
” numbers are 6 and 2 re-
spectively, then the bearing size for “J
1
” is:
EAS31077
INSTALLING THE CRANKSHAFT
1. Install:
• Crankshaft journal upper bearings
(into the upper crankcase)
“J
1
” (crankcase) - “J
1
” (balancer shaft web) - 1 =
6 - 2 - 1 = 3 (brown)
1
a
b
G0
8
9019
a
G0
8
9021
Bearing color code
Code 0
White
Code 1
Blue
Code 2
Black
Code 3
Brown
Code 4
Green
Code 5
Yellow
Code 6
Pink
J
1
J
2
J
3
J
4
J
1
J
2
J
3
J
4
J
1
J
2
J
3
J
4
Содержание YZF-R1
Страница 1: ...2020 SERVICE MANUAL YZF R1 YZF R1M YZFR1L YZFR1LC YZFR1ML YZF1MLC LIT 11616 33 33 B3L 28197 10 ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 38: ...SPECIAL TOOLS 1 29 ...
Страница 55: ...TIGHTENING TORQUES 2 16 ...
Страница 58: ...CABLE ROUTING 2 19 Frame front right side view A B C D E F G H I J K L M 1 1 1 2 3 5 5 4 4 4 6 5 7 8 9 ...
Страница 60: ...CABLE ROUTING 2 21 Frame rear right side view B A C D 2 1 2 3 4 5 6 7 ...
Страница 76: ...CABLE ROUTING 2 37 Rear fender left side view A B C D G 1 2 3 4 5 6 7 7 8 8 7 10 10 11 E 2 9 3 3 9 F 3 ...
Страница 82: ...CABLE ROUTING 2 43 Front brake hose left side view A 1 1 1 1 2 2 2 3 3 3 4 4 4 3 4 ...
Страница 84: ...CABLE ROUTING 2 45 Hydraulic unit assembly top and left side view A B C 1 2 3 3 4 4 5 6 7 7 8 8 9 10 10 11 11 ...
Страница 86: ...CABLE ROUTING 2 47 Fuel tank top and left side view A B 1 2 3 4 5 2 5 ...
Страница 88: ...CABLE ROUTING 2 49 Canister for California A E 1 2 3 4 5 6 B B B C D 7 8 9 10 E F G H E 7 10 11 ...
Страница 92: ...CABLE ROUTING 2 53 Air cut off valve right side view A B C C D E 1 2 2 3 3 3 4 4 5 5 5 6 7 ...
Страница 96: ...CABLE ROUTING 2 57 Radiator left side view A B C D E F G H I J G K L M N O 1 2 2 2 3 3 3 4 5 6 7 8 9 D ...
Страница 100: ...CABLE ROUTING 2 61 Muffler top and left side view 1 1 2 3 3 4 5 5 6 6 4 4 5 6 5 6 A ...
Страница 102: ...CABLE ROUTING 2 63 CCU top and right side view for YZF R1M A B C D E F G H 1 2 3 2 3 4 5 6 4 5 6 7 7 8 9 9 10 ...
Страница 104: ...CABLE ROUTING 2 65 ...
Страница 107: ......
Страница 144: ...PERIODIC MAINTENANCE 3 37 ...
Страница 149: ......
Страница 171: ...GENERAL CHASSIS 5 4 22 T R Front muffler protector bolt 7 N m 0 7 kgf m 5 2 lb ft b b a a 1 ...
Страница 222: ...REAR BRAKE 4 73 6 Adjust Rear brake light operation timing Refer to ADJUSTING THE REAR BRAKE LIGHT SWITCH on page 3 35 ...
Страница 280: ...CHAIN DRIVE 4 131 ...
Страница 336: ...ELECTRIC STARTER 5 53 1 2 3 a b ...
Страница 406: ...WATER PUMP 6 17 ...
Страница 432: ...AIR INDUCTION SYSTEM 7 25 ...
Страница 435: ......
Страница 441: ...IGNITION SYSTEM 8 6 ...
Страница 449: ...CHARGING SYSTEM 8 14 ...
Страница 453: ...LIGHTING SYSTEM 8 18 ...
Страница 488: ...ELECTRICAL COMPONENTS 8 53 ...
Страница 496: ...89_ABS 9 295 TROUBLESHOOTING 9 295 90_ABS 9 298 TROUBLESHOOTING 9 298 91_ABS 9 301 TROUBLESHOOTING 9 301 ...
Страница 497: ......
Страница 507: ...SYSTEM DIAGRAM 9 10 ...
Страница 525: ...STEERING DAMPER SYSTEM 9 28 ...
Страница 800: ...91_ABS 9 303 4 Defective hydraulic unit assembly Replace the hydraulic unit assembly ...
Страница 801: ...91_ABS 9 304 ...
Страница 804: ......
Страница 805: ......
Страница 806: ......