CHASSIS
3-17
e. Tighten the drive chain puller locknut.
EAM30247
CHECKING AND ADJUSTING THE
STEERING HEAD
1. Use a maintenance stand to raise the front
wheel off the ground.
WARNING
EWA13120
Securely support the vehicle so that there is
no danger of it falling over.
2. Check:
•
Steering head
Grasp the bottom of the front fork legs and
gently rock the front fork.
Blinding/looseness
Adjust the steering
head.
3. Remove:
•
Handlebar
Refer to “HANDLEBAR” on page 4-33.
•
Upper bracket
Refer to “STEERING HEAD” on page 4-51.
4. Adjust:
•
Steering head
a. Remove the washer “1”.
b. After loosening the ring nut “2” with a
steering nut wrench “3”, tighten it to the
specified torque.
TIP
•
Set the torque wrench at a right angle to the
steering nut wrench.
•
Move the steering to the left and right a couple
of times to check that it moves smoothly.
c. Turn the front fork to the right and left a few
times, and make sure that the steering ro-
tates smoothly. If it does not turn smooth-
ly, remove the lower bracket and check
the upper and lower bearings.
Refer to “STEERING HEAD” on page
4-51.
d. Loosen the ring nut fully turn and then
tighten it to specification with a steering
nut wrench.
WARNING
EWA21110
Do not overtighten the steering ring nut.
e. Check the steering head for looseness or
binding by turning the front fork all the way
in both directions. If any binding is felt, re-
move the lower bracket and check the up-
per and lower bearings.
Refer to “STEERING HEAD” on page
4-51.
f. Install the washer “1”.
Rear wheel axle nut
125 N·m (12.5 kgf·m, 92 lb·ft)
Drive chain puller locknut
19 N·m (1.9 kgf·m, 14 lb·ft)
T
R
.
.
T
R
.
.
1
Steering nut wrench
90890-01403
Exhaust flange nut wrench
YU-A9472
Steering ring nut (initial tighten-
ing torque)
38 N·m (3.8 kgf·m, 28 lb·ft)
Steering ring nut (final tightening
torque)
7 N·m (0.7 kgf·m, 5.2 lb·ft)
3
2
T
R
.
.
T
R
.
.
Содержание YZ250 2022
Страница 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Страница 8: ......
Страница 10: ......
Страница 38: ...MOTORCYCLE CARE AND STORAGE 1 26...
Страница 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view...
Страница 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine left side view...
Страница 58: ...CABLE ROUTING DIAGRAM 2 19 Frame and engine right side view...
Страница 60: ...CABLE ROUTING DIAGRAM 2 21 Handlebar front view 0 mm 0 in 0 mm 0 in...
Страница 62: ...CABLE ROUTING DIAGRAM 2 23 Rear brake right side view...
Страница 64: ...CABLE ROUTING DIAGRAM 2 25...
Страница 92: ...ELECTRICAL SYSTEM 3 26...
Страница 160: ...CHAIN DRIVE 4 66...
Страница 193: ...CLUTCH 5 31 2 1...
Страница 233: ...ELECTRICAL COMPONENTS 8 6 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch...
Страница 254: ...TROUBLESHOOTING 9 13...
Страница 261: ...ENGINE 10 6...
Страница 274: ......