For Service Engineers
Service Information
4/120
SI1906002J-002 : YSP10 installation and adjustment procedures
1. Preparation before machine installation
This section describes about the items to be prepared before machine installation and adjustment.
1.1. Required tools and materials
Part description
Q’ty
Remarks
Spirit level gauge
(0.1mm/m accuracy)
2
Used to measure the machine horizontal level.
46mm spanner
2
Used to adjust the leveling bolt height of the machine.
Scissors
1
Used to remove packaging materials
Line alignment jig set
1set
See “1.2 Line alignment jig arrangement” on page 5.
Wooden crowbar
1-2
Quantity varies with number of workers.
Wooden crowbar may chip over use and debris will scatter. When working
in a cleanroom, use a steel crowbar or equivalent to prevent flying debris.
Rubber plate
1-2
Quantity of rubber plates varies with that of crowbars. Care must be taken
not to stain or damage the installation site.
Sliding paper
8 sheets
(at least)
Paper sheet with one slippery side (like a sticker’s cover paper). Prepare
new paper sheets. Required size is minimum of 200mm square. Prepare
extra sheets since the sheets are easy to tear.
2-ton jack
1-3
Used when removing sliding paper from under the machine.
Hand lifter
1-2
1.5m or longer fork, 2 ton or higher lifting force
Cable tie
To be
described
later herein
Quantity varies depending on work contents, thus prepare extra amount.
Different cable tie sizes are required for different purposes.
Metal tape measure
1
To measure the board transfer height
Plumb-bob
2
Used to match the conveyor end with a reference line on the floor.
Board to test transfer
condition
2
(at least)
After aligning the line and adjusting conveyor connection, use the boards
to test their transfer condition. To transfer several boards continuously,
prepare at least two boards.
Prepare CUK-B0301 board (used for print feedback) or CUK-98001 board.
Cutting pliers
1
To cut off the cable ties