25
CABLE ROUTING
SPEC
1
Front turn signal light (right)
2
Front turn signal light (left)
3
Handlebar switch lead (right)
4
Front stop switch lead
5
Seat lock cable
6
Throttle cable
7
Handlebar switch lead (left)
8
Rear brake switch lead
9
Handlebar under cover
10
Stay
11
Horn
12
Front brake hose
13
Front wheel sensor
14
Horn
15
ABS test terminal
16
Handlebar upper cover
17
Handlebar
18
Front turn signal light
19
Grip heater lead (option)
A Route the front wheel sensor
through the guide on the frame.
B Route the handlebar switch lead
and front brake switch lead
through the guide.
C Route the front brake hose
through the right hole of the han-
dlebar under cover.
D Route the rear brake hose through
the left hole of the handlebar under
cover.
E Fasten the handlebar switch lead
(left) and rear brake switch lead to
the handlebar with a plastic lock-
ing tie. Cut the end of locking tie at
5 mm or less.
Содержание YP250A 1999
Страница 1: ......
Страница 2: ......
Страница 48: ...40 ANTI LOCK BRAKE SYSTEM ABS CHAS ABS CONNECTOR LOCATION CHART ...
Страница 76: ...68 ANTI LOCK BRAKE SYSTEM ABS CHAS 6 Install Wheel sensor lead 1 ...