2-24
CABLE ROUTING DIAGRAM
1.
Brake master cylinder
2.
Brake hose holder
3.
Brake hose
A.
Install the brake hose so that its
pipe portion directs as shown
and lightly touches the projec-
tion on the brake caliper.
B.
Pass the brake hose into the
brake hose holders.
C.
If the brake hose contacts the
spring (rear shock absorber),
correct its twist.
D.
Install the brake hose so that its
pipe portion directs as shown
and lightly touches the projec-
tion on the brake master cylin-
der.
Содержание WR450Fv2008
Страница 2: ......
Страница 43: ...2 18 TIGHTENING TORQUES ...
Страница 45: ...2 20 LUBRICATION DIAGRAMS 1 Intake camshaft 2 Exhaust camshaft A To main axle B From oil pump ...
Страница 69: ...3 16 ENGINE INTAKE EXHAUST ...
Страница 82: ...3 29 ELECTRICAL Charging method using a variable voltage charger ...
Страница 83: ...3 30 ELECTRICAL Charging method using a constant voltage charger ...
Страница 96: ...5 2 RADIATOR 11 Pipe 1 O ring 1 1 12 Catch tank breather hose 1 13 Catch tank 1 Order Part name Q ty Remarks ...
Страница 114: ...5 20 CYLINDER HEAD 3 Install Bolt cylinder head 1 Bolt cylinder head 10 Nm 1 0 m kg 7 2 ft lb ...
Страница 133: ...5 39 OIL PUMP 15 Oil pump drive shaft 1 16 Rotor housing 1 Order Part name Q ty Remarks ...
Страница 197: ...6 40 REAR SHOCK ABSORBER 8 Install Plastic band Taillight coupler Locking tie ...
Страница 205: ...7 8 ELECTRIC STARTING SYSTEM 2 Inspect Rubber part a Tears damage Replace ...
Страница 209: ...7 12 ELECTRIC STARTING SYSTEM 5 Install Bolt 1 O ring 2 Apply the lithium soap base grease on the O ring ...
Страница 219: ......